top of page

Innovation Complex "Sastobe" – Chemical Production Plant

Updated: Apr 28

Project Description:

The Innovation Complex "Sastobe" is a large-scale chemical production facility under construction in the Turkestan region of Kazakhstan. The plant is designed to produce:

• Caustic Soda: 100,000 tons per year

• Polyvinyl Chloride (PVC): 120,000 tons per year

• Calcium Carbide: 180,000 tons per year

• High-Quality Cement and Lime: Essential for copper production, a key requirement for enterprises like Kazakhmys and other industries in Kazakhstan, Turkey, China, and Russia .

The project aims to reduce Kazakhstan's reliance on imports for these essential chemical products and support the domestic manufacturing sector.

Current Status:

The construction of the Innovation Complex "Sastobe" is underway, with the first phase of the plant expected to be operational by 2025, and the second phase planned for completion in 2026. The plant will focus on producing caustic soda, PVC, calcium carbide, and other key chemical products for domestic consumption and export.

Start Date:

April 2023

End Date:

Phase 1: 2025

Phase 2: 2026-2027

Investment Volume (in mln USD):

Approximately $315 million (equivalent to KZT 136,6-153.8 billion)

Location:

Balykty village, Tyulkubas district, Turkestan region, Kazakhstan

Involved Companies:

1. Innovation Complex Sastobe LLP

Role: Project Developer / Borrower

Location: Balykty village, Tyulkubas district, Turkestan region, Kazakhstan

2. Sinoma Tianjin Cement Industry Design & Research Institute (Sinoma TCDRI)

Role: EPC Contractor (Design and Construction)

Address: No 16, Wangjing North Road, Chaoyang district Beijing

Phone: 010-64399518

Postal Code: 100102

3. Development Bank of Kazakhstan

Role: Financier

Address: Republic of Kazakhstan, Z05T3E2, Astana city, Yesil district, Mangilik Yel avenue, 55а

Phone: +7 (7172) 79 26 00 / Press office: +7 (7172) 79 26 08

Key People and Contact Details:

1. Sinoma TCDRI

Name: 赵峰 (zhaofeng)

Position: Sales Manager

2. Development Bank of Kazakhstan

Name: Botagoz Abisheva

Position: Deputy Chief Executive Officer

Name: Amir Taubayev

Position: General Manager

Other Important Details:

Employment Impact:

Construction Phase: Approximately 1,000 jobs

Operational Phase: Around 346 permanent positions for Kazakhstani specialists

Export Markets:

In addition to serving the domestic market, the plant plans to export to the Eurasian Economic Union (EAEU), the European Union, China, and Turkey.

Environmental Considerations:

The project emphasizes the use of modern, environmentally friendly technologies to ensure clean manufacturing processes.

Sources:


Photo Sources: astanatimes.com

留言


bottom of page