Ekibastuz GRES-3

Project Description:

Ekibastuz GRES-3 is a planned coal-fired thermal power plant with a projected capacity of 1,200 MW. The project is designed to meet Kazakhstan's increasing demand for electricity. It will utilize equipment originally procured for Ekibastuz GRES-2 and implement advanced technologies to reduce atmospheric emissions. The plant will be built within the existing Ekibastuz energy hub, leveraging infrastructure from GRES-1 and GRES-2.

Current Status:

Thus, in 2025, the Ekibastuz GRES-3 project is at the preparation stage, with construction scheduled to commence in 2027 and commissioning in 2029 or 2030.

ree

Start Date: 2025

End Date: 2029-2030

Investment Volume (in mln USD):

Approximately $1,440–1,560 million

Location:

Ekibastuz, Pavlodar Region, Republic of Kazakhstan

Involved Companies:

Samruk-Energy JSC

Ministry of Energy of the Republic of Kazakhstan

KEGOC JSC (Kazakhstan Electricity Grid Operating Company)

  • Role: National Grid Operator, integration of GRES-3

  • Address: Z00T2D0, Astana, Almaty district, 59 Tauelsizdik Ave

  • Phone: 8 (7172) 69-38-24 / 8 (7172) 69-05-68 / 8 (7172) 69-02-43

  • TELEPHONE NUMBER: 8 (800) 080-47-47

  • WhatsApp: 8-771-191-88-16

  • Email: mail@sk-hotline.kz

  • Email: kegoc@kegoc.kz 

  • Web: https://www.kegoc.kz/en/

  • LinkedIn

Key People and Contact Details:

Samruk-Energy JSC

Ministry of Energy of the Republic of Kazakhstan

KEGOC JSC

Other Important Details:

  • The project is part of Kazakhstan's strategy to modernize its power sector and reduce electricity shortages.

  • The use of existing equipment from China is expected to optimize costs and expedite the construction process.