Butadiene and Its Derivatives Production Plant
- ProB2B.KZ
- Mar 16
- 2 min read
Updated: Apr 10
Project Description: The project involves constructing a plant dedicated to producing butadiene and its derivatives, including synthetic rubbers such as styrene-butadiene-styrene and divinyl-styrene synthetic rubber. The facility aims to enhance Kazakhstan's petrochemical industry by supplying raw materials for tire manufacturing and other applications.

Current Status: Engineering works are ongoing, with technology licensors engaged for the project's development.
Start Date: November 2022
End Date: 2028
Investment Volume (in USD): Approximately 1 billion. www.kaztag.kz
Location: Petrochemical Special Economic Zone, Karabatan site, 43 km from Atyrau, Kazakhstan kmg.kz
Investor / Customer: Butadiene LLP, a joint venture between Tatneft PJSC (75%) and Sovereign Wealth Fund Samruk-Kazyna JSC (25%). interfax.com
Company Details:
Address: SEZ «NATIONAL INDUSTRIAL PETROCHEMICAL TECHNOPARK»
Phone: +7(727) 355 80 00, +7 702 499 66 12;
Email: diaz.diyanov@klpe.kz
Website: www.klpe.kz
Key People and Contact Details:
Name: Nail Maganov (General Director of Tatneft PJSC)
Address: 75, Lenin Str., 423450, Almetyevsk, Republic of Tatarstan, Russia
Phone: +7 (8553) 37-11-11
Email: tnr@tatneft.ru
Website: https://www.tatneft.ru
Name: Almassadam Satkaliyev (CEO of Samruk-Kazyna JSC)
Samruk-Kazyna JSC:
Address: 17/10, Syganak Street, 010000, Astana, Republic of Kazakhstan
Phone: +7 (7172) 55-40-01
Email: info@sk.kz
Website: Samruk-Kazyna JSC
Engineering Contractor: Lummus Technology (providing technology licensing and basic engineering services) interfax.com
Lummus Technology:
Address: 5825 N. Sam Houston Pkwy. W., Suite 600, Houston, TX 77086, United States
Phone: Contact form on website
Email: Contact form on website
Website: https://www.lummustechnology.com
General Contractor: Not publicly disclosed
Other Important Details:
Feedstock Supply: Tengizchevroil LLP will supply 380,000 tonnes of butane annually as raw material for the plant. kmg.kz
Production Capacity: The plant is expected to produce 120,000 tonnes of butadiene, 85,000 tonnes of isobutylene, and 40,000 tonnes of methyl tert-butyl ether (MTBE) annually. lummustechnology.com
Job Creation: The project will create over 2,000 jobs during construction and approximately 700 highly qualified positions during operation. kmg.kz
Technology Providers: Lummus Technology has been selected to provide technologies for dehydrogenation of n-butane, dehydrogenation of isobutane, production of MTBE, and butadiene extraction. lummustechnology.com
Photo source: plastinfo.ru
Comments