Nura 500 MW Wind Power Plant (Updated)

PROJECT ID
2701202601
SECTOR
Renewable Energy
PROJECT PHASE
Procurement & Construction
LOCATION
Saryozek, 100000 Volskoe, Kazakhstan
START DATE
4/30/2026
END DATE
3/31/2029
INVESTMENT VALUE
$ 650 M
Active
Verified
Last Updated: 6 July 2026
Publication: 21 May 2026
PROJECT DESCRIPTION
The Nura 500 MW Wind Power Plant is a major renewable energy project planned in Karaganda Region, Kazakhstan, near Saryozek village in Osakarov District. The project is designed as a large utility-scale wind farm with an installed capacity of 500 MW and an associated energy storage component. It is being developed under Kazakhstan–China renewable energy cooperation and is linked to the intergovernmental agreement between Kazakhstan and China on renewable energy projects. The project includes not only wind generation capacity, but also major grid infrastructure: expansion of the 500 kV Nura substation, construction of two 220 kV bays, two sing... Read more
Involved Companies & Contacts
INVOLVED COMPANIES & CONTACTS
COMPANY 1 INFO
COMPANY:
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░
ROLE:
░░░░░░░░░░░░░░░░░░░░░░░
ADDRESS:
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░
PHONE:
░░░░░░░░░░░░
EMAIL:
5. party1CompanyEmailText
WEBSITE:
░░░░░░░░░░░░░░░░░░░░
OTHER LINKS:
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░
KEY CONTACTS
NAME:
party1Contact1NameText
POSITION:
party1Contact1PositionText
PHONE:
party1Contact1PhoneText
EMAIL:
party1Contact1EmailText
LINK:
party1Contact1LinkText
NAME:
party1Contact2NameText
POSITION:
party1Contact2PositionText
PHONE:
party1Contact2PhoneText
EMAIL:
party1Contact2EmailText
LINK:
party1Contact2LinkText
COMPANY 2 INFO
COMPANY:
░░░░░░░░░░░░░░░░░░░░░░
ROLE:
░░░░░░░░░░░░░░░░░░░
ADDRESS:
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░
PHONE:
░░░░░░░░░░░░░
EMAIL:
░░░░░░░░░░░░░░░░░░░░
WEBSITE:
6. party1CompanyWebsiteText
OTHER LINKS:
7. party1CompanyWebsiteText
KEY CONTACTS
NAME:
░░░░░░░░░
POSITION:
░░░░░░░░░░░░░░░
PHONE:
party1Contact1PhoneText
EMAIL:
░░░░░░░░░░░░░░░░░░░░
LINK:
party1Contact1LinkText
NAME:
░░░░░░░░
POSITION:
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░
PHONE:
party1Contact2PhoneText
EMAIL:
party1Contact2EmailText
LINK:
party1Contact2LinkText
COMPANY 3 INFO
COMPANY:
░░░░░░░░░░░░░░░░░░░░░░░░░░
ROLE:
░░░░░░░░░░░░░░░░░░░
ADDRESS:
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░
PHONE:
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░
EMAIL:
░░░░░░░░░░░░░░░░░░░░░░░░░░░░
WEBSITE:
░░░░░░░░░░░░░░░░░░░░░░░░░░
OTHER LINKS:
7. party1CompanyWebsiteText
KEY CONTACTS
NAME:
party1Contact1NameText
POSITION:
party1Contact1PositionText
PHONE:
party1Contact1PhoneText
EMAIL:
party1Contact1EmailText
LINK:
party1Contact1LinkText
NAME:
party1Contact2NameText
POSITION:
party1Contact2PositionText
PHONE:
party1Contact2PhoneText
EMAIL:
party1Contact2EmailText
LINK:
party1Contact2LinkText
COMPANY 4 INFO
COMPANY:
░░░░░░░░░░░░░░░░░
ROLE:
░░░░░░░░░░░░░░░░░░░░░░░
ADDRESS:
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░
PHONE:
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░
EMAIL:
░░░░░░░░░░░░░░░░░░░
WEBSITE:
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░
OTHER LINKS:
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░
KEY CONTACTS
NAME:
party1Contact1NameText
POSITION:
party1Contact1PositionText
PHONE:
party1Contact1PhoneText
EMAIL:
party1Contact1EmailText
LINK:
party1Contact1LinkText
NAME:
party1Contact2NameText
POSITION:
party1Contact2PositionText
PHONE:
party1Contact2PhoneText
EMAIL:
party1Contact2EmailText
LINK:
party1Contact2LinkText
Location
Locations shown on the map are for indicative purposes and may vary from actual locations.
Other important details
Karaganda Wind Power LLP is 70% owned by Gezhouba International FZE and 30% owned by Samruk-Energy through Qazaq Green Power PLC.
According to the environmental documentation, the grid infrastructure package for the project is scheduled for completion by December 2026 with commissioning planned for Q2 2027, while media and industry sources state that the full 500 MW Nura Wind Power Plant is expected to be commissioned in Q1 2029.
The substation site will include two transformers, 220 kV outdoor switchgear, 35 kV indoor switchgear combined with the operational control building, SVG equipment, fire-pumping facilities, an electrical equipment warehouse with garage, auxiliary transformers, and a checkpoint.
Sources
░░░░░░░░░░░░░░
░░░░░░░░░░░░░░
░░░░░░░░░░░░░░
░░░░░░░░░░░░░░
Similar Projects
Khorgos–Eastern Khorgos–Easternddd
111111
111111
111111

23 hours ago
Unlock Full Project Details
Khorgos–Eastern Gate International Cargo and Passenger Airport
111111
111111
111111

23 hours ago
Total Investment
Khorgos–Eastern Gate International Cargo and Passenger Airport
111111
111111
111111

23 hours ago
Total Investment