Nura 500 MW Wind Power Plant (Updated)

Potato Processing Complex.jpg
Photo Sources: www.samruk-energy.kz

PROJECT ID

2701202601

SECTOR

Renewable Energy

PROJECT PHASE

Procurement & Construction

LOCATION

Saryozek, 100000 Volskoe, Kazakhstan

START DATE

4/30/2026

END DATE

3/31/2029

INVESTMENT VALUE

$ 650 M

Active

gifyyyyy.gif

Verified

Last Updated: 6 July 2026

Publication: 21 May 2026

PROJECT DESCRIPTION

The Nura 500 MW Wind Power Plant is a major renewable energy project planned in Karaganda Region, Kazakhstan, near Saryozek village in Osakarov District. The project is designed as a large utility-scale wind farm with an installed capacity of 500 MW and an associated energy storage component. It is being developed under Kazakhstan–China renewable energy cooperation and is linked to the intergovernmental agreement between Kazakhstan and China on renewable energy projects. The project includes not only wind generation capacity, but also major grid infrastructure: expansion of the 500 kV Nura substation, construction of two 220 kV bays, two sing... Read more

Involved Companies & Contacts

INVOLVED COMPANIES & CONTACTS

COMPANY 1 INFO

COMPANY:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

ROLE:

░░░░░░░░░░░░░░░░░░░░░░░

ADDRESS:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

PHONE:

░░░░░░░░░░░░

EMAIL:

5. party1CompanyEmailText

WEBSITE:

░░░░░░░░░░░░░░░░░░░░

OTHER LINKS:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

KEY CONTACTS

NAME:

party1Contact1NameText

POSITION:

party1Contact1PositionText

PHONE:

party1Contact1PhoneText

EMAIL:

party1Contact1EmailText

LINK:

party1Contact1LinkText

NAME:

party1Contact2NameText

POSITION:

party1Contact2PositionText

PHONE:

party1Contact2PhoneText

EMAIL:

party1Contact2EmailText

LINK:

party1Contact2LinkText

COMPANY 2 INFO

COMPANY:

░░░░░░░░░░░░░░░░░░░░░░

ROLE:

░░░░░░░░░░░░░░░░░░░

ADDRESS:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

PHONE:

░░░░░░░░░░░░░

EMAIL:

░░░░░░░░░░░░░░░░░░░░

WEBSITE:

6. party1CompanyWebsiteText

OTHER LINKS:

7. party1CompanyWebsiteText

KEY CONTACTS

NAME:

░░░░░░░░░

POSITION:

░░░░░░░░░░░░░░░

PHONE:

party1Contact1PhoneText

EMAIL:

░░░░░░░░░░░░░░░░░░░░

LINK:

party1Contact1LinkText

NAME:

░░░░░░░░

POSITION:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

PHONE:

party1Contact2PhoneText

EMAIL:

party1Contact2EmailText

LINK:

party1Contact2LinkText

COMPANY 3 INFO

COMPANY:

░░░░░░░░░░░░░░░░░░░░░░░░░░

ROLE:

░░░░░░░░░░░░░░░░░░░

ADDRESS:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

PHONE:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

EMAIL:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░

WEBSITE:

░░░░░░░░░░░░░░░░░░░░░░░░░░

OTHER LINKS:

7. party1CompanyWebsiteText

KEY CONTACTS

NAME:

party1Contact1NameText

POSITION:

party1Contact1PositionText

PHONE:

party1Contact1PhoneText

EMAIL:

party1Contact1EmailText

LINK:

party1Contact1LinkText

NAME:

party1Contact2NameText

POSITION:

party1Contact2PositionText

PHONE:

party1Contact2PhoneText

EMAIL:

party1Contact2EmailText

LINK:

party1Contact2LinkText

COMPANY 4 INFO

COMPANY:

░░░░░░░░░░░░░░░░░

ROLE:

░░░░░░░░░░░░░░░░░░░░░░░

ADDRESS:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

PHONE:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

EMAIL:

░░░░░░░░░░░░░░░░░░░

WEBSITE:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

OTHER LINKS:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

KEY CONTACTS

NAME:

party1Contact1NameText

POSITION:

party1Contact1PositionText

PHONE:

party1Contact1PhoneText

EMAIL:

party1Contact1EmailText

LINK:

party1Contact1LinkText

NAME:

party1Contact2NameText

POSITION:

party1Contact2PositionText

PHONE:

party1Contact2PhoneText

EMAIL:

party1Contact2EmailText

LINK:

party1Contact2LinkText

Location

Locations shown on the map are for indicative purposes and may vary from actual locations.

Other important details

  • Karaganda Wind Power LLP is 70% owned by Gezhouba International FZE and 30% owned by Samruk-Energy through Qazaq Green Power PLC.

  • According to the environmental documentation, the grid infrastructure package for the project is scheduled for completion by December 2026 with commissioning planned for Q2 2027, while media and industry sources state that the full 500 MW Nura Wind Power Plant is expected to be commissioned in Q1 2029.

  • The substation site will include two transformers, 220 kV outdoor switchgear, 35 kV indoor switchgear combined with the operational control building, SVG equipment, fire-pumping facilities, an electrical equipment warehouse with garage, auxiliary transformers, and a checkpoint.