top of page
hero-bg.png

Varvarinskoye Hub Hybrid Power Project

Potato Processing Complex.jpg
Photo Sources:

PROJECT ID

1311202501

SECTOR

Energy & Power Generation

PROJECT PHASE

Engineering Design & Planning

LOCATION

Костанайская область, Казахстан

START DATE

12/31/2025

END DATE

6/30/2026

INVESTMENT VALUE

$ 55 M

Active

gifyyyyy.gif

Verified

Last Updated: 6 July 2026

Publication: 13 November 2025

PROJECT DESCRIPTION

The Varvarinskoye Hub project involves the construction of a ~23 MW solar photovoltaic plant paired with up to ~40 MW gas‑piston (gas‑engine) power station. The hybrid configuration is designed to ensure stable electricity supply for Solidcore Resources’ mining operations, using solar power during the day and gas‑piston generation to balance intermittent solar output. This approach allows the company to reduce dependence on grid electricity (primarily coal‑generated), increase energy self‑sufficiency, and cut greenhouse gas emissions by around 27% compared to 2023 levels. The combination of renewable and flexible gas power is relatively uniqu... Read more

Involved Companies & Contacts

INVOLVED COMPANIES & CONTACTS

COMPANY 1 INFO

COMPANY:

░░░░░░░░░░░░░░░░░░░░░

ROLE:

░░░░░░░░░░░░░░░░░░░░░░░

ADDRESS:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

PHONE:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

EMAIL:

░░░░░░░░░░░░░░░░░░░░░░░░░░░

WEBSITE:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

OTHER LINKS:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

KEY CONTACTS

NAME:

░░░░░░░░░░

POSITION:

*****

PHONE:

party1Contact1PhoneText

EMAIL:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

LINK:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

NAME:

░░░░░░░░░░░░░░░░

POSITION:

░░░░░░░░░░░░░░░░░░░░░

PHONE:

party1Contact2PhoneText

EMAIL:

░░░░░░░░░░░░░░░░░░░░░░░

LINK:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

Location

Locations shown on the map are for indicative purposes and may vary from actual locations.

Other important details

  • The gas‑piston unit provides flexible generation to complement solar output, ensuring stable baseload for mining operations.

  • EPC contractors and detailed procurement plans have not yet been publicly disclosed.

  • The project will reduce reliance on coal‑based electricity and improve energy security for the site.

Sources

░░░░░░░░░░░░░░

░░░░░░░░░░░░░░

░░░░░░░░░░░░░░

░░░░░░░░░░░░░░

Similar Projects

bottom of page