top of page

Message

Meta Text Info

Fetching Project...

Varvarinskoye Hub Hybrid Power Project

Project ID:

1311202501

Project Name:

Varvarinskoye Hub Hybrid Power Project

Project Sector:

Energy & Power Generation

Photo source:

Value

image.png

Project Description

The Varvarinskoye Hub project involves the construction of a ~23 MW solar photovoltaic plant paired with up to ~40 MW gas‑piston (gas‑engine) power station. The hybrid configuration is designed to ensure stable electricity supply for Solidcore Resources’ mining operations, using solar power during the day and gas‑piston generation to balance intermittent solar output. This approach allows the company to reduce dependence on grid electricity (primarily coal‑generated), increase energy self‑sufficiency, and cut greenhouse gas emissions by around 27% compared to 2023 levels. The combination of renewable and flexible gas power is relatively unique in Kazakhstan, targeting a low‑carbon yet reliable energy solution. The project also aligns with the company’s decarbonisation strategy and Kazakhstan’s broader renewable energy goals.

Project Phase:

Engineering Design & Planning

Investment Value:

55 000 000 $

Location:

Костанайская область, Казахстан

Start Date:

12/31/2025

End Date:

6/30/2026

Involved Companies

Company:

░░░░░░░░░░░░░░░░░░░░░

Role:

░░░░░░░░░░░░░░░░░░░░░░░

Address:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

Phone:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

Email:

░░░░░░░░░░░░░░░░░░░░░░░░░░░

Website:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

Other links:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

Key Contacts

Name:

░░░░░░░░░░

Position:

*****

Phone:

Value

Email:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

Links:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

Name:

░░░░░░░░░░░░░░░░

Position:

░░░░░░░░░░░░░░░░░░░░░

Phone:

Value

Email:

░░░░░░░░░░░░░░░░░░░░░░░

Links:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

Company:

Value

Role:

Value

Address:

Value

Phone:

Value

Email:

Value

Website:

Value

Other links:

Value

Key Contacts

Name:

Value

Position:

Value

Phone:

Value

Email:

Value

Links:

Value

Name:

Value

Position:

Value

Phone:

Value

Value

Email:

Links:

Value

Company:

VALUE

Role:

Value

Address:

Value

Value

Phone:

Email:

Value

Website:

Value

Other links:

Value

Key Contacts

Name:

Value

Position:

Value

Phone:

Value

Value

Email:

Links:

Value

Name:

Value

Position:

Value

Phone:

Value

Email:

Value

Links:

Value

Company:

VALUE

Role:

Value

Address:

Value

Phone:

Value

Email:

Value

Website:

Value

Other links:

Value

Key Contacts

Name:

Value

Position:

Value

Value

Phone:

Value

Email:

Links:

Value

Name:

Value

Position:

Value

Phone:

Value

Email:

Value

Links:

Value

Company:

VALUE

Role:

Value

Address:

Value

Phone:

Value

Email:

Value

Website:

Value

Other links:

Value

Key Contacts

Name:

Value

Position:

Value

Value

Phone:

Email:

Value

Links:

Value

Name:

Value

Position:

Value

Phone:

Value

Value

Email:

Links:

Value

Other important details

  • The gas‑piston unit provides flexible generation to complement solar output, ensuring stable baseload for mining operations.

  • EPC contractors and detailed procurement plans have not yet been publicly disclosed.

  • The project will reduce reliance on coal‑based electricity and improve energy security for the site.

Publication/Revision Date:

11/13/2025

bottom of page