UCC Holding's 1100 MW CCGT Power Plant Project (Updated)

Potato Processing Complex.jpg
Photo Sources: UCC Holding

PROJECT ID

150520256

SECTOR

Energy & Power Generation

PROJECT PHASE

Engineering Design & Planning

LOCATION

Syrdariya District, Kazakhstan

START DATE

7/1/2026

END DATE

12/31/2030

INVESTMENT VALUE

$ 2400 M

Active

gifyyyyy.gif

Verified

Last Updated: 21 May 2026

Publication: 21 May 2026

PROJECT DESCRIPTION

The project involves the construction of a large-scale combined cycle gas turbine (CCGT) power plant with a planned capacity of approximately 1,100 MW in the Kyzylorda Region of Kazakhstan. The plant is designed as a high-efficiency gas-fired power generation facility intended to support the stability of Kazakhstan’s electricity system, especially the southern and central power zones. According to the environmental filing, the power plant will consist of two CCGT single-shaft / monoblock units, each including a gas turbine, heat recovery steam generator, and steam condensing turbine. The plant’s main fuel will be natural gas from the Beineu–B... Read more

Involved Companies & Contacts

INVOLVED COMPANIES & CONTACTS

COMPANY 1 INFO

COMPANY:

░░░░░░░░░

ROLE:

░░░░░░░░░░░░░░░░░░░░░░░

ADDRESS:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

PHONE:

░░░░░░░░░░░░░░░░░░░░░░░░░░░

EMAIL:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

WEBSITE:

░░░░░░░░░░░░░░░░░░░░░░░░

OTHER LINKS:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

KEY CONTACTS

NAME:

░░░░░░░░░░

POSITION:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

PHONE:

party1Contact1PhoneText

EMAIL:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

LINK:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

NAME:

░░░░░░░░░░░░░

POSITION:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░

PHONE:

party1Contact2PhoneText

EMAIL:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░

LINK:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

COMPANY 2 INFO

COMPANY:

░░░░░░░░░░░░░░░░░

ROLE:

░░░░░░░░░░░░░░░░░░░░░░░

ADDRESS:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

PHONE:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

EMAIL:

░░░░░░░░░░░░░░░░░░░

WEBSITE:

░░░░░░░░░░░░░░░░░░░░░░░░░░

OTHER LINKS:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

KEY CONTACTS

NAME:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░

POSITION:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

PHONE:

░░░░░░░░░░░░░░░

EMAIL:

░░░░░░░░░░░░░░░░░░░░░░░░

LINK:

party1Contact1LinkText

NAME:

░░░░░░░░░░░

POSITION:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

PHONE:

░░░░░░░░░░░░░

EMAIL:

░░░░░░░░░░░░░░░░░░░░░░░░░░░

LINK:

party1Contact2LinkText

COMPANY 3 INFO

COMPANY:

░░░░░░░░░░░░░░░░░░░

ROLE:

░░░░░░░░░░░░░░░░░░░░░░░, ░░░░░░░░░░░░░░░░░░░

ADDRESS:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

PHONE:

4. party1CompanyPhoneText

EMAIL:

5. party1CompanyEmailText

WEBSITE:

6. party1CompanyWebsiteText

OTHER LINKS:

7. party1CompanyWebsiteText

KEY CONTACTS

NAME:

░░░░░░░░░░

POSITION:

*****

PHONE:

party1Contact1PhoneText

EMAIL:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

LINK:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

NAME:

party1Contact2NameText

POSITION:

party1Contact2PositionText

PHONE:

party1Contact2PhoneText

EMAIL:

party1Contact2EmailText

LINK:

party1Contact2LinkText

Location

Locations shown on the map are for indicative purposes and may vary from actual locations.

Other important details

  • Technology options reviewed: Siemens, Ansaldo Energia, Mitsubishi, Dongfang Electric Corporation, and General Electric were considered during the feasibility work. The preferred configuration in the feasibility study is listed as Siemens SGT5-4000F gas turbines with SST-3000 steam turbines.

  • A comparative assessment of water supply options showed a strong economic preference for groundwater wells: the estimated cost of the well-based solution is approximately USD 1 million, compared to about USD 14.3 million for constructing a water intake and pipeline system from the Syr Darya River.

  • The project is designed primarily for electricity generation and grid support; the plant is not intended to provide district heating or urban heat supply services.

  • The CCGT facility is intended to provide flexible / dispatchable generation capacity to support balancing and stability of Kazakhstan’s southern and central power zones, rather than serving solely as a conventional baseload power plant.

  • The project ownership structure is based on a joint venture model: Samruk-Energy holds 30%, while UCC Qazaqstan 3 LLC holds 70% through the dedicated project company Kyzylorda Energy Ltd.