UCC Holding's 1100 MW CCGT Power Plant Project (Updated)

PROJECT ID
150520256
SECTOR
Energy & Power Generation
PROJECT PHASE
Engineering Design & Planning
LOCATION
Syrdariya District, Kazakhstan
START DATE
7/1/2026
END DATE
12/31/2030
INVESTMENT VALUE
$ 2400 M
Active
Verified
Last Updated: 21 May 2026
Publication: 21 May 2026
PROJECT DESCRIPTION
The project involves the construction of a large-scale combined cycle gas turbine (CCGT) power plant with a planned capacity of approximately 1,100 MW in the Kyzylorda Region of Kazakhstan. The plant is designed as a high-efficiency gas-fired power generation facility intended to support the stability of Kazakhstan’s electricity system, especially the southern and central power zones. According to the environmental filing, the power plant will consist of two CCGT single-shaft / monoblock units, each including a gas turbine, heat recovery steam generator, and steam condensing turbine. The plant’s main fuel will be natural gas from the Beineu–B... Read more
Involved Companies & Contacts
INVOLVED COMPANIES & CONTACTS
COMPANY 1 INFO
COMPANY:
░░░░░░░░░
ROLE:
░░░░░░░░░░░░░░░░░░░░░░░
ADDRESS:
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░
PHONE:
░░░░░░░░░░░░░░░░░░░░░░░░░░░
EMAIL:
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░
WEBSITE:
░░░░░░░░░░░░░░░░░░░░░░░░
OTHER LINKS:
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░
KEY CONTACTS
NAME:
░░░░░░░░░░
POSITION:
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░
PHONE:
party1Contact1PhoneText
EMAIL:
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░
LINK:
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░
NAME:
░░░░░░░░░░░░░
POSITION:
░░░░░░░░░░░░░░░░░░░░░░░░░░░░
PHONE:
party1Contact2PhoneText
EMAIL:
░░░░░░░░░░░░░░░░░░░░░░░░░░░░
LINK:
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░
COMPANY 2 INFO
COMPANY:
░░░░░░░░░░░░░░░░░
ROLE:
░░░░░░░░░░░░░░░░░░░░░░░
ADDRESS:
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░
PHONE:
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░
EMAIL:
░░░░░░░░░░░░░░░░░░░
WEBSITE:
░░░░░░░░░░░░░░░░░░░░░░░░░░
OTHER LINKS:
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░
KEY CONTACTS
NAME:
░░░░░░░░░░░░░░░░░░░░░░░░░░░░
POSITION:
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░
PHONE:
░░░░░░░░░░░░░░░
EMAIL:
░░░░░░░░░░░░░░░░░░░░░░░░
LINK:
party1Contact1LinkText
NAME:
░░░░░░░░░░░
POSITION:
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░ ░░░
PHONE:
░░░░░░░░░░░░░
EMAIL:
░░░░░░░░░░░░░░░░░░░░░░░░░░░
LINK:
party1Contact2LinkText
COMPANY 3 INFO
COMPANY:
░░░░░░░░░░░░░░░░░░░
ROLE:
░░░░░░░░░░░░░░░░░░░░░░░, ░░░░░░░░░░░░░░░░░░░
ADDRESS:
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░
PHONE:
4. party1CompanyPhoneText
EMAIL:
5. party1CompanyEmailText
WEBSITE:
6. party1CompanyWebsiteText
OTHER LINKS:
7. party1CompanyWebsiteText
KEY CONTACTS
NAME:
░░░░░░░░░░
POSITION:
*****
PHONE:
party1Contact1PhoneText
EMAIL:
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░
LINK:
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░
NAME:
party1Contact2NameText
POSITION:
party1Contact2PositionText
PHONE:
party1Contact2PhoneText
EMAIL:
party1Contact2EmailText
LINK:
party1Contact2LinkText
Location
Locations shown on the map are for indicative purposes and may vary from actual locations.
Other important details
Technology options reviewed: Siemens, Ansaldo Energia, Mitsubishi, Dongfang Electric Corporation, and General Electric were considered during the feasibility work. The preferred configuration in the feasibility study is listed as Siemens SGT5-4000F gas turbines with SST-3000 steam turbines.
A comparative assessment of water supply options showed a strong economic preference for groundwater wells: the estimated cost of the well-based solution is approximately USD 1 million, compared to about USD 14.3 million for constructing a water intake and pipeline system from the Syr Darya River.
The project is designed primarily for electricity generation and grid support; the plant is not intended to provide district heating or urban heat supply services.
The CCGT facility is intended to provide flexible / dispatchable generation capacity to support balancing and stability of Kazakhstan’s southern and central power zones, rather than serving solely as a conventional baseload power plant.
The project ownership structure is based on a joint venture model: Samruk-Energy holds 30%, while UCC Qazaqstan 3 LLC holds 70% through the dedicated project company Kyzylorda Energy Ltd.