Soda Ash Production Plant – Qazaq Soda

Project ID:

230520252

Project Name:

Soda Ash Production Plant – Qazaq Soda

Project Sector:

Industrial Manufacturing, Mining & Metallurgy

image.png

Project Description

This project involves the construction of Kazakhstan's first soda ash (sodium carbonate) production plant in the Sarysu District of the Zhambyl Region. The facility will have an initial capacity of 500,000 tons per year, with the potential to expand to 1.2 million tons. Implemented by Qazaq Soda LLP, a subsidiary of Turkey’s YILDIRIM Holding, the project uses the Solvay ammonia process with advanced environmental controls to minimize emissions and waste. The plant is expected to meet all domestic demand, replace imports, and open up exports to neighboring countries. Around 1,300 direct jobs and 1,000 indirect jobs are expected to be created. The project will follow the highest ecological standards and significantly boost the region’s industrial development.

Project Phase:

Procurement & Construction

Investment Value:

400 000 000 $

Location:

Sarysu District, Zhambyl Region, Kazakhstan

Start Date:

5/21/2024

End Date:

5/21/2026

Involved Companies

Company:

░░░░░░░░░░░░

Role:

░░░░░░░░░░░░░░░░░░░░░░░

Address:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

Phone:

░░░░░░░░░░

Email:

░░░░░░░░░░░░░░░░

Website:

Value

Other links:

Value

Key Contacts

Name:

Value

Position:

Value

Phone:

Value

Email:

Value

Links:

Value

Name:

Value

Position:

Value

Phone:

Value

Email:

Value

Links:

Value

Company:

░░░░░░░░░░░░░░

Role:

░░░░░░░░░░░░░░░░░░░░░░░

Address:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

Phone:

░░░░░░░░░░░░░░

Email:

░░░░░░░░░░░░░░░░░░░░

Website:

░░░░░░░░░░░░░░░░░░░░░░░░░░

Other links:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

Key Contacts

Name:

░░░░░░░░░░

Position:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

Phone:

Value

Email:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░

Links:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

Name:

░░░░░░░░░

Position:

░░░░░░░░░░░░

Phone:

Value

Email:

░░░░░░░░░░░░░░░░░░░░░░░░░░░

Links:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

Company:

░░░░░░░░░

Role:

░░░░░░░░░░░░░░░░░░░

Address:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

Phone:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

Email:

░░░░░░░░░░░░░

Website:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

Other links:

Value

Key Contacts

Name:

░░░░░░░░░░

Position:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

Phone:

Value

Email:

░░░░░░░░░░░░░░░░░

Links:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

Name:

Value

Position:

Value

Phone:

Value

Email:

Value

Links:

Value

Company:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

Role:

░░░░░░░░░░░░░░░░░░░░░░░░

Address:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

Phone:

░░░░░░░░░░░░░

Email:

Value

Website:

Value

Other links:

Value

Key Contacts

Name:

Value

Position:

Value

Phone:

Value

Email:

Value

Links:

Value

Name:

Value

Position:

Value

Phone:

Value

Email:

Value

Links:

Value

Company:

VALUE

Role:

Value

Address:

Value

Phone:

Value

Email:

Value

Website:

Value

Other links:

Value

Key Contacts

Name:

Value

Position:

Value

Phone:

Value

Email:

Value

Links:

Value

Name:

Value

Position:

Value

Phone:

Value

Email:

Value

Links:

Value

Other important details

The project is structured into three main phases: (1) preparation and permitting in early to mid-2024, including public hearings held on 21 April 2025 in Saudaqent village; (2) the main construction phase from August 2024 to August 2026, covering site works, infrastructure, and equipment installation; and (3) commissioning and finalization in Q3 2026. Full plant launch is scheduled for August 2026. Local raw materials including salt and limestone will be used. Utilities include water from Akkol Lake and artesian wells. Cogeneration TPP will be installed for heat and power needs. Transport logistics will use both rail and road, with dedicated access roads and rail lines under development. The plant uses a closed-loop Solvay ammonia process ensuring minimal emissions and almost zero waste.

Publication/Revision Date:

5/23/2025