Meta Text Info
Fetching Project...
Soda Ash Production Plant – Qazaq Soda
Project ID:
230520252
Project Name:
Soda Ash Production Plant – Qazaq Soda
Project Sector:
Industrial Manufacturing, Mining & Metallurgy
Photo source:

Project Description
This project involves the construction of Kazakhstan's first soda ash (sodium carbonate) production plant in the Sarysu District of the Zhambyl Region. The facility will have an initial capacity of 500,000 tons per year, with the potential to expand to 1.2 million tons. Implemented by Qazaq Soda LLP, a subsidiary of Turkey’s YILDIRIM Holding, the project uses the Solvay ammonia process with advanced environmental controls to minimize emissions and waste. The plant is expected to meet all domestic demand, replace imports, and open up exports to neighboring countries. Around 1,300 direct jobs and 1,000 indirect jobs are expected to be created. The project will follow the highest ecological standards and significantly boost the region’s industrial development.
Project Phase:
Procurement & Construction
Investment Value:
400 000 000 $
Location:
Sarysu District, Zhambyl Region, Kazakhstan
Start Date:
5/21/2024
End Date:
5/21/2026
Involved Companies
Company:
░░░░░░░░░░░░
Role:
░░░░░░░░░░░░░░░░░░░░░░░
Address:
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░
Phone:
░░░░░░░░░░
Email:
░░░░░░░░░░░░░░░░
Website:
Value
Other links:
Value
Key Contacts
Name:
Value
Position:
Value
Phone:
Value
Email:
Value
Links:
Value
Name:
Value
Position:
Value
Phone:
Value
Email:
Value
Links:
Value
Company:
░░░░░░░░░░░░░░
Role:
░░░░░░░░░░░░░░░░░░░░░░░
Address:
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░
Phone:
░░░░░░░░░░░░░░
Email:
░░░░░░░░░░░░░░░░░░░░
Website:
░░░░░░░░░░░░░░░░░░░░░░░░░░
Other links:
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░
Key Contacts
Name:
░░░░░░░░░░
Position:
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░
Phone:
Value
Email:
░░░░░░░░░░░░░░░░░░░░░░░░░░░░
Links:
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░
Name:
░░░░░░░░░
Position:
░░░░░░░░░░░░
Phone:
Value
Email:
░░░░░░░░░░░░░░░░░░░░░░░░░░░
Links:
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░
Company:
░░░░░░░░░
Role:
░░░░░░░░░░░░░░░░░░░
Address:
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░
Phone:
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░
Email:
░░░░░░░░░░░░░
Website:
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░
Other links:
Value
Key Contacts
Name:
░░░░░░░░░░
Position:
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░
Phone:
Value
Email:
░░░░░░░░░░░░░░░░░
Links:
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░
Name:
Value
Position:
Value
Phone:
Value
Email:
Value
Links:
Value
Company:
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░
Role:
░░░░░░░░░░░░░░░░░░░░░░░░
Address:
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░
Phone:
░░░░░░░░░░░░░
Email:
Value
Website:
Value
Other links:
Value
Key Contacts
Name:
Value
Position:
Value
Phone:
Value
Email:
Value
Links:
Value
Name:
Value
Position:
Value
Phone:
Value
Email:
Value
Links:
Value
Company:
VALUE
Role:
Value
Address:
Value
Phone:
Value
Email:
Value
Website:
Value
Other links:
Value
Key Contacts
Name:
Value
Position:
Value
Phone:
Value
Email:
Value
Links:
Value
Name:
Value
Position:
Value
Phone:
Value
Email:
Value
Links:
Value
Other important details
The project is structured into three main phases: (1) preparation and permitting in early to mid-2024, including public hearings held on 21 April 2025 in Saudaqent village; (2) the main construction phase from August 2024 to August 2026, covering site works, infrastructure, and equipment installation; and (3) commissioning and finalization in Q3 2026. Full plant launch is scheduled for August 2026. Local raw materials including salt and limestone will be used. Utilities include water from Akkol Lake and artesian wells. Cogeneration TPP will be installed for heat and power needs. Transport logistics will use both rail and road, with dedicated access roads and rail lines under development. The plant uses a closed-loop Solvay ammonia process ensuring minimal emissions and almost zero waste.
Publication/Revision Date:
5/23/2025