top of page

Message

Meta Text Info

Fetching Project...

Shymkent Solid Waste Sorting Plant

Project ID:

1601202602

Project Name:

Shymkent Solid Waste Sorting Plant

Project Sector:

Water & Environment & Waste

Photo source:

Value

image.png

Project Description

The project involves a comprehensive reform of the solid municipal waste (MSW) management system in Shymkent through a public–private partnership (PPP) model. It introduces a single citywide operator responsible for the collection, transportation, sorting, and partial recycling of municipal waste. A key component of the project is the construction of a modern waste sorting plant located at the city landfill, designed to significantly increase the share of recyclable materials and reduce landfill volumes. The project aims to eliminate fragmented waste services, improve service quality, and introduce unified operational standards. The private partner finances infrastructure investments, including specialized vehicles, containers, digital monitoring systems, and the sorting facility itself. During the concession period, the private operator manages the entire waste flow of the city. Upon completion of the PPP term, ownership of the sorting plant is transferred to the city administration. The project is aligned with Kazakhstan’s national waste management and environmental modernization policies. It also serves as preparatory infrastructure for future waste-to-energy projects planned in Shymkent.

Project Phase:

Engineering Design & Planning

Investment Value:

10 500 000 $

Location:

Value

Start Date:

Value

End Date:

1/1/2027

Involved Companies

Company:

░░░░░░░░░░░░░░░

Role:

░░░░░░░░░░░░░░░░░░░░░░░

Address:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

Phone:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

Email:

░░░░░░░░░░░░░░░░░░░

Website:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

Other links:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

Key Contacts

Name:

░░░░░░░░░░░░░░░░░

Position:

░░░░░░░░░░░░░

Phone:

Value

Email:

Value

Links:

Value

Name:

Value

Position:

Value

Phone:

Value

Email:

Value

Links:

Value

Company:

Value

Role:

Value

Address:

Value

Phone:

Value

Email:

Value

Website:

Value

Other links:

Value

Key Contacts

Name:

Value

Position:

Value

Phone:

Value

Email:

Value

Links:

Value

Name:

Value

Position:

Value

Phone:

Value

Value

Email:

Links:

Value

Company:

VALUE

Role:

Value

Address:

Value

Value

Phone:

Email:

Value

Website:

Value

Other links:

Value

Key Contacts

Name:

Value

Position:

Value

Phone:

Value

Value

Email:

Links:

Value

Name:

Value

Position:

Value

Phone:

Value

Email:

Value

Links:

Value

Company:

VALUE

Role:

Value

Address:

Value

Phone:

Value

Email:

Value

Website:

Value

Other links:

Value

Key Contacts

Name:

Value

Position:

Value

Value

Phone:

Value

Email:

Links:

Value

Name:

Value

Position:

Value

Phone:

Value

Email:

Value

Links:

Value

Company:

VALUE

Role:

Value

Address:

Value

Phone:

Value

Email:

Value

Website:

Value

Other links:

Value

Key Contacts

Name:

Value

Position:

Value

Value

Phone:

Email:

Value

Links:

Value

Name:

Value

Position:

Value

Phone:

Value

Value

Email:

Links:

Value

Other important details

  • The project operates under a Build–Operate–Transfer (BOT) PPP model with a 10-year concession period.

  • Ownership of the sorting plant will be transferred to the Akimat of Shymkent after completion of the PPP term.

  • Public environmental impact assessment (OVOS/EIA) and related hearings are mandatory prior to construction.

  • The project consolidates waste flows previously handled by more than 10 separate operators.

  • The sorting facility is intended to support downstream recycling markets and future waste-to-energy capacity.

Publication/Revision Date:

1/16/2026

bottom of page