Seven Rivers Technologies Glass Container Manufacturing Plant

PROJECT ID
2905202601
SECTOR
Water & Environment & Waste, Industrial Manufacturing
PROJECT PHASE
Procurement & Construction
LOCATION
Kyzylorda, Kazakhstan
START DATE
5/28/2026
END DATE
12/31/2027
INVESTMENT VALUE
$ 130 M
Active
Verified
Last Updated: 28 May 2026
Publication: 29 May 2026
PROJECT DESCRIPTION
The Seven Rivers Technologies Glass Container Manufacturing Plant is a new industrial project planned in Kyzylorda, Kazakhstan. The project involves the construction of a plant for processing solid household waste in the form of glass cullet and producing glass containers. The designed annual production capacity is 240 million glass containers. The maximum capacity of the main process equipment is 280 tonnes of glass melt per day. The facility is planned on a 38.08-hectare land plot in the Ondiris Industrial Zone. The project is positioned as part of the development of a regional glass cluster in Kyzylorda Region. The plant will use glass cul... Read more
Involved Companies & Contacts
INVOLVED COMPANIES & CONTACTS
COMPANY 1 INFO
COMPANY:
░░░░░░░░░░░░░░░░░░░░░░░░░░░
ROLE:
░░░░░░░░░░░░░░░░░░░░░░░
ADDRESS:
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░
PHONE:
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░
EMAIL:
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░
WEBSITE:
6. party1CompanyWebsiteText
OTHER LINKS:
7. party1CompanyWebsiteText
KEY CONTACTS
NAME:
░░░░░░░░░░░░
POSITION:
░░░░░░
PHONE:
party1Contact1PhoneText
EMAIL:
party1Contact1EmailText
LINK:
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░
NAME:
party1Contact2NameText
POSITION:
party1Contact2PositionText
PHONE:
party1Contact2PhoneText
EMAIL:
party1Contact2EmailText
LINK:
party1Contact2LinkText
COMPANY 2 INFO
COMPANY:
░░░░░░░░░░░░░░░░░░░░░░
ROLE:
░░░░░░░░░░░░░░░░░░░
ADDRESS:
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░
PHONE:
░░░░░░░░░░░░░
EMAIL:
░░░░░░░░░░░░░░
WEBSITE:
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░
OTHER LINKS:
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░
KEY CONTACTS
NAME:
░░░░░░░░░░░░
POSITION:
*****
PHONE:
party1Contact1PhoneText
EMAIL:
░░░░░░░░░░░░░░░░░░░░░░░░
LINK:
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░
NAME:
░░░░░░░░░░░░░░░░░░░░
POSITION:
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░
PHONE:
party1Contact2PhoneText
EMAIL:
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░
LINK:
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░
COMPANY 3 INFO
COMPANY:
░░░░░░░░░░░
ROLE:
░░░░░░
ADDRESS:
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░
PHONE:
4. party1CompanyPhoneText
EMAIL:
░░░░░░░░░░░░░
WEBSITE:
░░░░░░░░░░░░░░░░░░░░░░
OTHER LINKS:
7. party1CompanyWebsiteText
KEY CONTACTS
NAME:
░░░░░░░░░░░░
POSITION:
░░░░░░
PHONE:
party1Contact1PhoneText
EMAIL:
party1Contact1EmailText
LINK:
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░
NAME:
party1Contact2NameText
POSITION:
party1Contact2PositionText
PHONE:
party1Contact2PhoneText
EMAIL:
party1Contact2EmailText
LINK:
party1Contact2LinkText
COMPANY 4 INFO
COMPANY:
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░
ROLE:
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░
ADDRESS:
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░
PHONE:
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░
EMAIL:
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░
WEBSITE:
░░░░░░░░░░░░░░░░░░░░░░
OTHER LINKS:
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░
KEY CONTACTS
NAME:
░░░░░░░░░░░░░░░
POSITION:
░░░░░░
PHONE:
party1Contact1PhoneText
EMAIL:
party1Contact1EmailText
LINK:
party1Contact1LinkText
NAME:
party1Contact2NameText
POSITION:
party1Contact2PositionText
PHONE:
party1Contact2PhoneText
EMAIL:
party1Contact2EmailText
LINK:
party1Contact2LinkText
Location
Locations shown on the map are for indicative purposes and may vary from actual locations.
Other important details
The project organization plan identifies major demand for construction machinery, cranes, concrete equipment, temporary power supply, diesel generators, dewatering systems, pumps, site offices, sanitary cabins, warehouses and temporary roads. The project also includes industrial utility systems such as a 35/10 kV input electrical substation, 10/0.4 kV transformer substations, gas regulation unit, diesel generator, boiler houses, dry cooling tower, fire-fighting pumping station and fire water reservoir. Environmental and process-related infrastructure includes aspiration units, stormwater reservoirs, wastewater treatment facilities, oil separator, grease trap and cullet handling areas. The site is designed for both road and railway logistics, including automobile scales and railway scales.
Project Organization Plan / ПОС — confirms the construction duration of 21 months, 18 months of construction and installation works, 4 months commissioning, total cost of 130 million EUR, equipment cost of 62 million EUR, C&I cost of 68 million EUR, and maximum construction workforce of 420 people.