top of page

Message

Meta Text Info

Fetching Project...

Novodneprovskoye and Sharyk Gold Mine Project

image.png

Project ID:

1803202601

Project Sector:

Mining & Metallurgy

Project Name:

Novodneprovskoye and Sharyk Gold Mine Project

Photo source:

Value

Project Description

The project involves the development of two satellite gold deposits, Novodneprovskoye and Sharyk, in the Burabay district of Akmola region, Kazakhstan, under RG Gold ownership, now part of Zijin Gold International. The development plan includes the construction of open-pit mines for both deposits, designed to extract oxidized gold ores via heap leaching. A new gold-processing facility (heap-leach metallurgical complex) will be built with an annual capacity of 600,000 tons of ore. Supporting infrastructure will include internal roads, administrative and service buildings, water and energy supply systems, and environmental protection facilities, such as monitoring stations and wastewater treatment units. The project aims to extend the existing Raygorodok mining operations and integrate new ore sources efficiently while maintaining environmental compliance. Novodneprovskoye is planned to operate from 2027 to 2031, while Sharyk will be mined in 2030. These works will expand production capacity, optimize ore processing, and ensure safe, regulated operations. The project represents a strategic addition to Zijin’s international portfolio, enhancing Kazakhstan’s gold production.

megaphone.png

Project Phase:

Engineering Design & Planning

Start Date:

Value

statistics.png

Investment Value:

Value

End Date:

1/1/2027

location.png

Location:

Akmola Region, Kazakhstan

Involved Companies

Company:

░░░░░

Role:

░░░░░░░░░░░░░░

Address:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

Phone:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

Email:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

Website:

░░░░░░░░░░░░░░░░░░

Other links:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

Key Contacts

Name:

░░░░░░░░░░░░░░░░

Position:

░░░░

Phone:

Value

Email:

░░░░░░░░░░░░░░░░░░░░░░░░░░

Links:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

Name:

░░░░░░░░░░░░░░░░░

Position:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

Phone:

Value

Email:

░░░░░░░░░░░░░░░░░░░░░░░░░░░

Links:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

Company:

░░░░░░░░░░░░░░░░░░░░░░

Role:

░░░░░░░░░░░░░░░░░░░░░░░

Address:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

Phone:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

Email:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

Website:

░░░░░░░░░░░░░░░░░░░░░░░░

Other links:

Value

Key Contacts

Name:

Value

Position:

Value

Phone:

Value

Email:

Value

Links:

Value

Name:

Value

Position:

Value

Phone:

Value

Value

Email:

Links:

Value

Company:

VALUE

Phone:

Value

Email:

Value

Address:

Value

Role:

Value

Website:

Value

Other links:

Value

Key Contacts

Name:

Value

Position:

Value

Phone:

Value

Value

Email:

Links:

Value

Name:

Value

Position:

Value

Phone:

Value

Email:

Value

Links:

Value

Company:

VALUE

Role:

Value

Address:

Value

Phone:

Value

Email:

Value

Website:

Value

Other links:

Value

Key Contacts

Name:

Value

Position:

Value

Phone:

Value

Email:

Value

Links:

Value

Name:

Value

Position:

Value

Phone:

Value

Email:

Value

Links:

Value

Company:

VALUE

Role:

Value

Address:

Value

Phone:

Value

Email:

Value

Website:

Value

Other links:

Value

Key Contacts

Name:

Value

Position:

Value

Value

Phone:

Email:

Value

Links:

Value

Name:

Value

Position:

Value

Phone:

Value

Email:

Value

Links:

Value

Other important details

  • The project will integrate satellite deposits into the main Raygorodok concession area.

  • Mining will be carried out exclusively by open-pit methods, avoiding underground operations.

  • Heap-leach technology is chosen for efficient gold extraction from oxidized ores with minimal environmental impact.

  • Infrastructure includes roads, utilities, service facilities, and environmental monitoring systems, ensuring safe and regulated operations.

  • The project has undergone environmental assessments and preliminary permitting, consistent with Kazakhstan’s regulations.

  • Supports employment and local economic activity in the Burabay district.

  • Production volumes: 600,000 tons of ore annually; estimated gold reserves: 1,246 kg (Novodneprovskoye) and 142 kg (Sharyk).

Publication/Revision Date:

3/18/2026

bottom of page