top of page

Message

Meta Text Info

Fetching Project...

Kurchatov 700 MW Coal-Fired Power Plant

Project ID:

2001202501

Project Name:

Kurchatov 700 MW Coal-Fired Power Plant

Project Sector:

Energy & Power Generation

Photo source:

image.png

Project Description

The Kurchatov Power Station is a planned coal-fired electricity generation facility in eastern Kazakhstan with an installed capacity of 700 megawatts, designed to address domestic electricity supply deficits as part of the country’s energy development strategy. It will be built on technologies described as “clean coal” with ultra-supercritical steam parameters, intended to improve thermal efficiency and reduce emissions relative to conventional coal plants. The project was tendered by the Ministry of Energy of the Republic of Kazakhstan, and the winner — TOO “GRES Kurchatov” — entered into a contract in January 2026 to finance, design, build, operate, and maintain the plant without direct budget financing. Construction is expected to occur in two phases, with the first 350 MW unit planned for 2029 and the second for 2030, under a broader schedule to complete the project by 2032. The choice of bituminous coal from nearby deposits as the principal fuel reflects local resource availability, and the facility will include modern flue gas cleaning and dust suppression systems to meet environmental standards. The project is intended to create up to 4,000 jobs during construction and 400 permanent jobs in operation, and is part of Kazakhstan’s national plan to add generation capacity through both traditional and clean energy sources.

Project Phase:

Procurement & Construction

Investment Value:

1 480 000 000 $

Location:

Value

Start Date:

Value

End Date:

1/31/2030

Involved Companies

Company:

░░░░░░░░░░░░░░░░░░

Role:

░░░░░░░░░░░░░░░░░░░░░░░

Address:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

Phone:

░░░░░░░░░░░░░░

Email:

Value

Website:

Value

Other links:

Value

Key Contacts

Name:

░░░░░░░░░░░░░░░░

Position:

*****

Phone:

Value

Email:

Value

Links:

Value

Name:

Value

Position:

Value

Phone:

Value

Email:

Value

Links:

Value

Company:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

Role:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

Address:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

Phone:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

Email:

Value

Website:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

Other links:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

Key Contacts

Name:

░░░░░░░░░░░░░░░░

Position:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

Phone:

░░░░░░░░░░░░░░░░

Email:

░░░░░░░░░░░░░░░░░░░░░░░░░

Links:

Value

Name:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

Position:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

Phone:

░░░░░░░░░░░░░░░░

░░░░░░░░░░░░░░░░░░░░░░░░░░░

Email:

Links:

Value

Company:

VALUE

Role:

Value

Address:

Value

Value

Phone:

Email:

Value

Website:

Value

Other links:

Value

Key Contacts

Name:

Value

Position:

Value

Phone:

Value

Value

Email:

Links:

Value

Name:

Value

Position:

Value

Phone:

Value

Email:

Value

Links:

Value

Company:

VALUE

Role:

Value

Address:

Value

Phone:

Value

Email:

Value

Website:

Value

Other links:

Value

Key Contacts

Name:

Value

Position:

Value

Value

Phone:

Value

Email:

Links:

Value

Name:

Value

Position:

Value

Phone:

Value

Email:

Value

Links:

Value

Company:

VALUE

Role:

Value

Address:

Value

Phone:

Value

Email:

Value

Website:

Value

Other links:

Value

Key Contacts

Name:

Value

Position:

Value

Value

Phone:

Email:

Value

Links:

Value

Name:

Value

Position:

Value

Phone:

Value

Value

Email:

Links:

Value

Other important details

  • It is likely that the company changed its name from “GRES Kurchatov” to “ABAI POWER”, while keeping the same BIN.

  • The founder is Utegenov Temirlan Isataevich.

bottom of page