Integration of the Western Zone into Kazakhstan's Unified Power System (Updated)

PROJECT ID

140520259

SECTOR

Energy & Power Generation

PROJECT PHASE

Procurement & Construction

LOCATION

West Kazakhstan Region, Казахстан

START DATE

11/1/2024

END DATE

12/31/2028

INVESTMENT VALUE

$ 376 M

Active

gifyyyyy.gif

Verified

Last Updated: 6 July 2026

Publication: 18 December 2025

PROJECT DESCRIPTION

This project comprises the construction of a new 500 kV overhead transmission line approximately 604.3 km in length between the Karabatan switching point and the Ulke substation to interconnect the currently isolated Western Zone with the main Unified Power System (UPS) of Kazakhstan. It also includes the reconstruction and expansion of the Ulke 500 kV substation and the construction of a 500 kV outdoor switchyard at Karabatan. The initiative is designed to enhance energy security, reliability of power supply, and the ability to utilize maneuverable generation capacity in the western region to balance electricity and capacity imbalances natio... Read more

Involved Companies & Contacts

INVOLVED COMPANIES & CONTACTS

COMPANY 1 INFO

COMPANY:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

ROLE:

░░░░░░░░░░░░░░░░░░░░░░░

ADDRESS:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

PHONE:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

EMAIL:

░░░░░░░░░░░░

WEBSITE:

░░░░░░░░░░░░░░░░░

OTHER LINKS:

7. party1CompanyWebsiteText

KEY CONTACTS

NAME:

░░░░░░░░░░░░░░░░░░░

POSITION:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

PHONE:

░░░░░░░░░░░░░░░░

EMAIL:

░░░░░░░░░░░░

LINK:

party1Contact1LinkText

NAME:

░░░░░░░░░░░░░░░

POSITION:

party1Contact2PositionText

PHONE:

░░░░░░░░░░░░░░

EMAIL:

░░░░░░░░░░░░░░░░░░░░░░░░░░░

LINK:

party1Contact2LinkText

COMPANY 2 INFO

COMPANY:

░░░░░░░░░░░░░░░░░

ROLE:

░░░░░░░░░░░░░░░░░░░

ADDRESS:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

PHONE:

░░░░░░░░░░░░░░░░

EMAIL:

░░░░░░░░░░░░░░

WEBSITE:

░░░░░░░░░░░░░░░░░░░░

OTHER LINKS:

7. party1CompanyWebsiteText

KEY CONTACTS

NAME:

party1Contact1NameText

POSITION:

party1Contact1PositionText

PHONE:

party1Contact1PhoneText

EMAIL:

party1Contact1EmailText

LINK:

party1Contact1LinkText

NAME:

party1Contact2NameText

POSITION:

party1Contact2PositionText

PHONE:

party1Contact2PhoneText

EMAIL:

party1Contact2EmailText

LINK:

party1Contact2LinkText

COMPANY 3 INFO

COMPANY:

░░░░░░░░░░░░░░░░░░░░░░░░░░░

ROLE:

░░░░░░░░░░░░░░░░░░░

ADDRESS:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

PHONE:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

EMAIL:

░░░░░░░░░░░░░░░░░░

WEBSITE:

6. party1CompanyWebsiteText

OTHER LINKS:

7. party1CompanyWebsiteText

KEY CONTACTS

NAME:

party1Contact1NameText

POSITION:

party1Contact1PositionText

PHONE:

party1Contact1PhoneText

EMAIL:

party1Contact1EmailText

LINK:

party1Contact1LinkText

NAME:

party1Contact2NameText

POSITION:

party1Contact2PositionText

PHONE:

party1Contact2PhoneText

EMAIL:

party1Contact2EmailText

LINK:

party1Contact2LinkText

COMPANY 4 INFO

COMPANY:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

ROLE:

░░░░░░░░░░░░░░░░░░░

ADDRESS:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

PHONE:

░░░░░░░░░░░░░

EMAIL:

░░░░░░░░░░░░░░░░░░░

WEBSITE:

░░░░░░░░░░░░░░░░░░░░░

OTHER LINKS:

7. party1CompanyWebsiteText

KEY CONTACTS

NAME:

party1Contact1NameText

POSITION:

party1Contact1PositionText

PHONE:

party1Contact1PhoneText

EMAIL:

party1Contact1EmailText

LINK:

party1Contact1LinkText

NAME:

party1Contact2NameText

POSITION:

party1Contact2PositionText

PHONE:

party1Contact2PhoneText

EMAIL:

party1Contact2EmailText

LINK:

party1Contact2LinkText

Location

Locations shown on the map are for indicative purposes and may vary from actual locations.

Other important details

  • The line will traverse Atyrau and Aktobe regions, serving strategic grid reinforcement objectives and enabling better integration of future renewable generation

  • Environmental Category A project under EBRD rules

  • A full Environmental and Social Impact Assessment (ESIA) was conducted, including public consultations

  • Supports national energy integration and renewable energy expansion

Sources

░░░░░░░░░░░░░░

░░░░░░░░░░░░░░

░░░░░░░░░░░░░░

░░░░░░░░░░░░░░

Similar Projects

bottom of page