Expansion of Ust‑Kamenogorsk CHP
Project ID:
1512202501
Project Name:
Expansion of Ust‑Kamenogorsk CHP
Project Sector:
Energy & Power Generation
Photo source:

Project Description
The project involves the expansion of the existing Ust‑Kamenogorsk Combined Heat and Power (CHP) plant to address acute shortages in electrical and thermal energy supply in the East Kazakhstan region. It foresees the installation of a new turbine unit (No. 13) with a capacity of 100 MW and a boiler unit (No. 16) with steam production capacity of 400 tons per hour, thereby increasing the overall heat production capacity by approximately 130 Gcal/hour. This increase is expected to reduce the deficit of heat in Ust‑Kamenogorsk by nearly 39 percent and support growing industrial and residential demand. The project integrates modern energy‑efficient and environmentally compliant technologies to improve operational performance and reduce equipment wear. It also aims to enhance reliability during peak winter periods, lower the specific fuel consumption, and reduce the overall wear of key equipment. During construction, up to 500 temporary jobs are to be created, and after commissioning about 53 permanent jobs related to operation and maintenance. The expansion builds on existing infrastructure and involves public consultations and regulatory approvals in partnership with the Ministry of Energy of the Republic of Kazakhstan.
Project Phase:
Engineering Design & Planning
Investment Value:
270 000 000 $
Location:
Value
Start Date:
5/1/2026
End Date:
7/1/2028
Involved Companies
Company:
░░░░░░░░░░░░░░░░░░░░░
Role:
░░░░░░░░░░░░░░░░░░░░░░░
Address:
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░
Phone:
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░
Email:
░░░░░░░░░░░░░░
Website:
░░░░░░░░░░░░░░░░░░
Other links:
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░
Key Contacts
Name:
░░░░░░░░░░░░░░░
Position:
*****
Phone:
Value
Email:
Value
Links:
Value
Name:
Value
Position:
Value
Phone:
Value
Email:
Value
Links:
Value
Company:
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░
Role:
░░░░░░░░░░░░░░░░░░░
Address:
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░
Phone:
░░░░░░░░░░░░░░
Email:
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░
Website:
░░░░░░░░░░░░░░░░░
Other links:
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░
Key Contacts
Name:
░░░░░░
Position:
░░░░░░░░░░░░░░░░░░░░░
Phone:
Value
Email:
░░░░░░░░░░░░░░░░░░░
Links:
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░
Name:
Value
Position:
Value
Phone:
Value
Value
Email:
Links:
Value
Company:
VALUE
Role:
Value
Address:
Value
Value
Phone:
Email:
Value
Website:
Value
Other links:
Value
Key Contacts
Name:
Value
Position:
Value
Phone:
Value
Value
Email:
Links:
Value
Name:
Value
Position:
Value
Phone:
Value
Email:
Value
Links:
Value
Company:
VALUE
Role:
Value
Address:
Value
Phone:
Value
Email:
Value
Website:
Value
Other links:
Value
Key Contacts
Name:
Value
Position:
Value
Value
Phone:
Value
Email:
Links:
Value
Name:
Value
Position:
Value
Phone:
Value
Email:
Value
Links:
Value
Company:
VALUE
Role:
Value
Address:
Value
Phone:
Value
Email:
Value
Website:
Value
Other links:
Value
Key Contacts
Name:
Value
Position:
Value
Value
Phone:
Email:
Value
Links:
Value
Name:
Value
Position:
Value
Phone:
Value
Value
Email:
Links:
Value
Other important details
The EPC contracting structure for the project has not yet been finalized. As of the latest available information, the EPC contractor is still at the negotiation stage, and no officially signed EPC agreement has been publicly disclosed.