Project Description
The Darbaza-Maktaaral railway line is a large-scale infrastructure project implemented on behalf of the President of the Republic of Kazakhstan to improve transport connectivity between Kazakhstan and Uzbekistan. With a length of 152 km, the line will directly connect Yerdaut and Zhetysai stations with the state border, bypassing the territory of Uzbekistan. The project is realized in two stages: the first section will connect Maktaaral and Yerdaut to the Syr Darya border station, the second - Zhetysai to the same point. The construction includes the use of more than 19,700 tons of rails, 280,000 sleepers and fasteners, as well as the construction of 35 bridges and 135 culverts. The key facility will be a 500-meter bridge over the Syr Darya River. The project is expected to relieve the overloaded Saryagash-Tashkent section and increase cargo traffic by 10-14 million tons per year, with a prospect of 20-25 million tons. Engineering surveys, including geological, hydrological and archaeological works, have also been completed, and the project is part of a nationwide plan to build and modernize over 1,300 km of railway lines in the next three years.
Project Phase:
Initiation & Feasibility
Investment Value:
542 000 000 $
Location:
Turkistan, Kazakhstan
Start Date:
11/1/2023
End Date:
1/1/2026
Involved Companies
Company:
░░░░░░░░░░░░░░░░░░░░░░░░░░
Role:
░░░░░░░░░░░░░░░░░░░░░░░
Address:
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░
Phone:
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░
Email:
Value
Website:
░░░░░░░░░░░░░░░░░░░░░
Other links:
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░
Key Contacts
Name:
░░░░░░░░░░░░░░
Position:
░░░░░░░░░░░░
Phone:
Value
Email:
░░░░░░░░░░░░░░░░░░░░░░░
Links:
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░
Name:
░░░░░░░░░░░░░░░░
Position:
░░░░░░░░░░░░░░░░
Phone:
Value
Email:
░░░░░░░░░░░░░░░░░░░░░░░
Links:
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░
Company:
Value
Role:
Value
Address:
Value
Phone:
Value
Email:
Value
Website:
Value
Other links:
Value
Key Contacts
Name:
Value
Position:
Value
Phone:
Value
Email:
Value
Links:
Value
Name:
Value
Position:
Value
Phone:
Value
Value
Email:
Links:
Value
Company:
VALUE
Role:
Value
Address:
Value
Value
Phone:
Email:
Value
Website:
Value
Other links:
Value
Key Contacts
Name:
Value
Position:
Value
Phone:
Value
Value
Email:
Links:
Value
Name:
Value
Position:
Value
Phone:
Value
Email:
Value
Links:
Value
Company:
VALUE
Role:
Value
Address:
Value
Phone:
Value
Email:
Value
Website:
Value
Other links:
Value
Key Contacts
Name:
Value
Position:
Value
Value
Phone:
Value
Email:
Links:
Value
Name:
Value
Position:
Value
Phone:
Value
Email:
Value
Links:
Value
Company:
VALUE
Role:
Value
Address:
Value
Phone:
Value
Email:
Value
Website:
Value
Other links:
Value
Key Contacts
Name:
Value
Position:
Value
Value
Phone:
Email:
Value
Links:
Value
Name:
Value
Position:
Value
Phone:
Value
Value
Email:
Links:
Value
Other important details
More than six million cubic meters of earth bed has been paved - 50% of the total volume.
105 km of rail tracks have already been delivered
The project is crucial for Kazakhstan–Uzbekistan freight logistics and regional trade integration
Syrdarya bridge (500 meters) is one of the critical engineering components
Publication/Revision Date:
8/5/2025