Darbaza–Maktaaral Railway Line

Potato Processing Complex.jpg
Photo Sources: rail-news.kz

PROJECT ID

172025156

SECTOR

Logistics & Transport

PROJECT PHASE

Initiation & Feasibility

LOCATION

Turkistan, Kazakhstan

START DATE

11/1/2023

END DATE

1/1/2026

INVESTMENT VALUE

$ 542 M

Active

gifyyyyy.gif

Verified

Last Updated: 25 April 2026

Publication: 5 August 2025

PROJECT DESCRIPTION

The Darbaza-Maktaaral railway line is a large-scale infrastructure project implemented on behalf of the President of the Republic of Kazakhstan to improve transport connectivity between Kazakhstan and Uzbekistan. With a length of 152 km, the line will directly connect Yerdaut and Zhetysai stations with the state border, bypassing the territory of Uzbekistan. The project is realized in two stages: the first section will connect Maktaaral and Yerdaut to the Syr Darya border station, the second - Zhetysai to the same point. The construction includes the use of more than 19,700 tons of rails, 280,000 sleepers and fasteners, as well as the constru... Read more

Involved Companies & Contacts

INVOLVED COMPANIES & CONTACTS

COMPANY 1 INFO

COMPANY:

░░░░░░░░░░░░░░░░░░░░░░░░░░

ROLE:

░░░░░░░░░░░░░░░░░░░░░░░

ADDRESS:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

PHONE:

EMAIL:

5. party1CompanyEmailText

WEBSITE:

░░░░░░░░░░░░░░░░░░░░░

OTHER LINKS:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

KEY CONTACTS

NAME:

░░░░░░░░░░░░░░

POSITION:

░░░░░░░░░░░░

PHONE:

party1Contact1PhoneText

EMAIL:

░░░░░░░░░░░░░░░░░░░░░░░

LINK:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

NAME:

░░░░░░░░░░░░░░░░

POSITION:

░░░░░░░░░░░░░░░░

PHONE:

party1Contact2PhoneText

EMAIL:

░░░░░░░░░░░░░░░░░░░░░░░

LINK:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

Location

Locations shown on the map are for indicative purposes and may vary from actual locations.

Other important details

  • More than six million cubic meters of earth bed has been paved - 50% of the total volume.

  • 105 km of rail tracks have already been delivered

  • The project is crucial for Kazakhstan–Uzbekistan freight logistics and regional trade integration

  • Syrdarya bridge (500 meters) is one of the critical engineering components