Darbaza–Maktaaral Railway Line

Project ID:

172025156

Project Name:

Darbaza–Maktaaral Railway Line

Project Sector:

Logistics & Transport

Photo source:

rail-news.kz

image.png

Project Description

The Darbaza-Maktaaral railway line is a large-scale infrastructure project implemented on behalf of the President of the Republic of Kazakhstan to improve transport connectivity between Kazakhstan and Uzbekistan. With a length of 152 km, the line will directly connect Yerdaut and Zhetysai stations with the state border, bypassing the territory of Uzbekistan. The project is realized in two stages: the first section will connect Maktaaral and Yerdaut to the Syr Darya border station, the second - Zhetysai to the same point. The construction includes the use of more than 19,700 tons of rails, 280,000 sleepers and fasteners, as well as the construction of 35 bridges and 135 culverts. The key facility will be a 500-meter bridge over the Syr Darya River. The project is expected to relieve the overloaded Saryagash-Tashkent section and increase cargo traffic by 10-14 million tons per year, with a prospect of 20-25 million tons. Engineering surveys, including geological, hydrological and archaeological works, have also been completed, and the project is part of a nationwide plan to build and modernize over 1,300 km of railway lines in the next three years.

Project Phase:

Initiation & Feasibility

Investment Value:

542 000 000 $

Location:

Turkistan, Kazakhstan

Start Date:

11/1/2023

End Date:

1/1/2026

Involved Companies

Company:

░░░░░░░░░░░░░░░░░░░░░░░░░░

Role:

░░░░░░░░░░░░░░░░░░░░░░░

Address:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

Phone:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

Email:

Value

Website:

░░░░░░░░░░░░░░░░░░░░░

Other links:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

Key Contacts

Name:

░░░░░░░░░░░░░░

Position:

░░░░░░░░░░░░

Phone:

Value

Email:

░░░░░░░░░░░░░░░░░░░░░░░

Links:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

Name:

░░░░░░░░░░░░░░░░

Position:

░░░░░░░░░░░░░░░░

Phone:

Value

Email:

░░░░░░░░░░░░░░░░░░░░░░░

Links:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

Company:

Value

Role:

Value

Address:

Value

Phone:

Value

Email:

Value

Website:

Value

Other links:

Value

Key Contacts

Name:

Value

Position:

Value

Phone:

Value

Email:

Value

Links:

Value

Name:

Value

Position:

Value

Phone:

Value

Value

Email:

Links:

Value

Company:

VALUE

Role:

Value

Address:

Value

Value

Phone:

Email:

Value

Website:

Value

Other links:

Value

Key Contacts

Name:

Value

Position:

Value

Phone:

Value

Value

Email:

Links:

Value

Name:

Value

Position:

Value

Phone:

Value

Email:

Value

Links:

Value

Company:

VALUE

Role:

Value

Address:

Value

Phone:

Value

Email:

Value

Website:

Value

Other links:

Value

Key Contacts

Name:

Value

Position:

Value

Value

Phone:

Value

Email:

Links:

Value

Name:

Value

Position:

Value

Phone:

Value

Email:

Value

Links:

Value

Company:

VALUE

Role:

Value

Address:

Value

Phone:

Value

Email:

Value

Website:

Value

Other links:

Value

Key Contacts

Name:

Value

Position:

Value

Value

Phone:

Email:

Value

Links:

Value

Name:

Value

Position:

Value

Phone:

Value

Value

Email:

Links:

Value

Other important details

  • More than six million cubic meters of earth bed has been paved - 50% of the total volume.

  • 105 km of rail tracks have already been delivered

  • The project is crucial for Kazakhstan–Uzbekistan freight logistics and regional trade integration

  • Syrdarya bridge (500 meters) is one of the critical engineering components