PROJECT DESCRIPTION
The Darbaza-Maktaaral railway line is a large-scale infrastructure project implemented on behalf of the President of the Republic of Kazakhstan to improve transport connectivity between Kazakhstan and Uzbekistan. With a length of 152 km, the line will directly connect Yerdaut and Zhetysai stations with the state border, bypassing the territory of Uzbekistan. The project is realized in two stages: the first section will connect Maktaaral and Yerdaut to the Syr Darya border station, the second - Zhetysai to the same point. The construction includes the use of more than 19,700 tons of rails, 280,000 sleepers and fasteners, as well as the constru... Read more
Involved Companies & Contacts
INVOLVED COMPANIES & CONTACTS
COMPANY 1 INFO
COMPANY:
░░░░░░░░░░░░░░░░░░░░░░░░░░
ROLE:
░░░░░░░░░░░░░░░░░░░░░░░
ADDRESS:
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░
PHONE:
EMAIL:
5. party1CompanyEmailText
WEBSITE:
░░░░░░░░░░░░░░░░░░░░░
OTHER LINKS:
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░
KEY CONTACTS
NAME:
░░░░░░░░░░░░░░
POSITION:
░░░░░░░░░░░░
PHONE:
party1Contact1PhoneText
EMAIL:
░░░░░░░░░░░░░░░░░░░░░░░
LINK:
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░
NAME:
░░░░░░░░░░░░░░░░
POSITION:
░░░░░░░░░░░░░░░░
PHONE:
party1Contact2PhoneText
EMAIL:
░░░░░░░░░░░░░░░░░░░░░░░
LINK:
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░
Location
Locations shown on the map are for indicative purposes and may vary from actual locations.
Other important details
More than six million cubic meters of earth bed has been paved - 50% of the total volume.
105 km of rail tracks have already been delivered
The project is crucial for Kazakhstan–Uzbekistan freight logistics and regional trade integration
Syrdarya bridge (500 meters) is one of the critical engineering components