top of page

Message

Meta Text Info

Fetching Project...

Construction of Hydropower Plant on the Baskhan River

image.png

Project ID:

1603202601

Project Sector:

Energy & Power Generation, Renewable Energy

Project Name:

Construction of Hydropower Plant on the Baskhan River

Photo source:

Project Description

The project involves the construction of a cascade of small hydropower plants on the Baskhan River in the Sarkand District of the Zhetysu Region of Kazakhstan. The development includes two derivation-type hydropower stations designed to utilize the river’s flow through a water intake structure and pressurized pipelines. Each station will contain a single horizontal hydro-unit consisting of a turbine and generator. Water from the river will be diverted through steel penstocks to the turbine units where electricity will be generated and then transmitted to the national power grid. The project is intended to contribute to Kazakhstan’s renewable energy generation capacity and reduce electricity shortages in the southern power zone of the country. The hydropower cascade is expected to produce at least 87 million kWh of electricity annually. The generated electricity will be delivered to the Unified Energy System of Kazakhstan. The facilities will include water intake structures, derivation pipelines, turbine conduits, powerhouse buildings, tailrace channels, and an outdoor switchgear connected to transmission lines. The project is classified as a renewable energy generation facility under Kazakhstan’s energy legislation. Environmental impact assessment documentation has been prepared and public hearings have been conducted as part of the permitting process.

megaphone.png

Project Phase:

Engineering Design & Planning

Start Date:

4/1/2026

statistics.png

Investment Value:

Value

End Date:

4/30/2027

location.png

Location:

Almaty Region, Kazakhstan

Involved Companies

Company:

░░░░░░░░░░░░

Role:

░░░░░░░░░░░░░░░░░░░░░░░

Address:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

Phone:

░░░░░░░░░░░░░░

Email:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

Website:

Value

Other links:

Value

Key Contacts

Name:

░░░░░░░░░░░░░░░░░░░░░░

Position:

░░░░░░░░░░░░░░

Phone:

Value

Email:

Value

Links:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

Name:

Value

Position:

Value

Phone:

Value

Email:

Value

Links:

Value

Company:

░░░░░░░░░░░░░░░░░░░

Role:

░░░░░░░░░░░░░░░░░░░░░░░

Address:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

Phone:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

Email:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

Website:

░░░░░░░░░░░░░░░░░░░░

Other links:

Value

Key Contacts

Name:

░░░░░░░░░░░░░░░░░░░░░░

Position:

░░░░░░░░░░░░░░

Phone:

Value

Email:

Value

Links:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

Name:

Value

Position:

Value

Phone:

Value

Value

Email:

Links:

Value

Company:

VALUE

Phone:

Value

Email:

Value

Address:

Value

Role:

Value

Website:

Value

Other links:

Value

Key Contacts

Name:

Value

Position:

Value

Phone:

Value

Value

Email:

Links:

Value

Name:

Value

Position:

Value

Phone:

Value

Email:

Value

Links:

Value

Company:

VALUE

Role:

Value

Address:

Value

Phone:

Value

Email:

Value

Website:

Value

Other links:

Value

Key Contacts

Name:

Value

Position:

Value

Phone:

Value

Email:

Value

Links:

Value

Name:

Value

Position:

Value

Phone:

Value

Email:

Value

Links:

Value

Company:

VALUE

Role:

Value

Address:

Value

Phone:

Value

Email:

Value

Website:

Value

Other links:

Value

Key Contacts

Name:

Value

Position:

Value

Value

Phone:

Email:

Value

Links:

Value

Name:

Value

Position:

Value

Phone:

Value

Email:

Value

Links:

Value

Other important details

  • Igor Nikolayevich Sinkov is listed as the head of several related energy companies, including Private Company EnergyBridge Ltd., Alt Energy LLP, and Energobuildservice LLP, with all these appointments made in 2025.

  • Private Company EnergyBridge Ltd is indicated as a founder of Energobuildservice LLP and Alt Energy LLP, the developer of the hydropower project.

  • Public environmental hearings were conducted on 24 December 2025.

  • The hydropower stations are derivation-type plants, meaning water is diverted through pipelines rather than stored in a large reservoir.

  • Each plant will have one horizontal hydro-unit with a turbine and generator.

  • The project is part of Kazakhstan’s strategy to expand renewable energy capacity and reduce greenhouse gas emissions.

  • The generated electricity will be supplied to the Unified Energy System of Kazakhstan.

Publication/Revision Date:

3/16/2026

bottom of page