
Construction of Hydropower Plant on the Baskhan River

PROJECT ID
1603202601
SECTOR
Energy & Power Generation, Renewable Energy
PROJECT PHASE
Engineering Design & Planning
LOCATION
Almaty Region, Kazakhstan
START DATE
4/1/2026
END DATE
4/30/2027
INVESTMENT VALUE
$ NA
Active
Verified
Last Updated: 6 July 2026
Publication: 16 March 2026
PROJECT DESCRIPTION
The project involves the construction of a cascade of small hydropower plants on the Baskhan River in the Sarkand District of the Zhetysu Region of Kazakhstan. The development includes two derivation-type hydropower stations designed to utilize the river’s flow through a water intake structure and pressurized pipelines. Each station will contain a single horizontal hydro-unit consisting of a turbine and generator. Water from the river will be diverted through steel penstocks to the turbine units where electricity will be generated and then transmitted to the national power grid. The project is intended to contribute to Kazakhstan’s renewable ... Read more
Involved Companies & Contacts
INVOLVED COMPANIES & CONTACTS
COMPANY 1 INFO
COMPANY:
░░░░░░░░░░░░
ROLE:
░░░░ ░░░░░░░░░░░░░░░░░░░
ADDRESS:
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░
PHONE:
░░░░░░░░░░░░░░
EMAIL:
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░
WEBSITE:
6. party1CompanyWebsiteText
OTHER LINKS:
7. party1CompanyWebsiteText
KEY CONTACTS
NAME:
░░░░░░░░░░░░░░░░░░░░░░
POSITION:
░░░░░░░░░░░░░░
PHONE:
party1Contact1PhoneText
EMAIL:
party1Contact1EmailText
LINK:
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░
NAME:
party1Contact2NameText
POSITION:
party1Contact2PositionText
PHONE:
party1Contact2PhoneText
EMAIL:
party1Contact2EmailText
LINK:
party1Contact2LinkText
COMPANY 2 INFO
COMPANY:
░░░░░░░░░░░░░░░░░░░
ROLE:
░░░░░░░░░░░░░░░░░░░░░░░
ADDRESS:
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░
PHONE:
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░
EMAIL:
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░
WEBSITE:
░░░░░░░░░░░░░░░░░░░░
OTHER LINKS:
7. party1CompanyWebsiteText
KEY CONTACTS
NAME:
░░░░░░░░░░░░░░░░░░░░░░
POSITION:
░░░░░░░░░░░░░░
PHONE:
party1Contact1PhoneText
EMAIL:
party1Contact1EmailText
LINK:
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░
NAME:
party1Contact2NameText
POSITION:
party1Contact2PositionText
PHONE:
party1Contact2PhoneText
EMAIL:
party1Contact2EmailText
LINK:
party1Contact2LinkText
Location
Locations shown on the map are for indicative purposes and may vary from actual locations.
Other important details
Igor Nikolayevich Sinkov is listed as the head of several related energy companies, including Private Company EnergyBridge Ltd., Alt Energy LLP, and Energobuildservice LLP, with all these appointments made in 2025.
Private Company EnergyBridge Ltd is indicated as a founder of Energobuildservice LLP and Alt Energy LLP, the developer of the hydropower project.
Public environmental hearings were conducted on 24 December 2025.
The hydropower stations are derivation-type plants, meaning water is diverted through pipelines rather than stored in a large reservoir.
Each plant will have one horizontal hydro-unit with a turbine and generator.
The project is part of Kazakhstan’s strategy to expand renewable energy capacity and reduce greenhouse gas emissions.
The generated electricity will be supplied to the Unified Energy System of Kazakhstan.
Sources
░░░░░░░░░░░░░░
░░░░░░░░░░░░░░
░░░░░░░░░░░░░░
░░░░░░░░░░░░░░
Similar Projects
Khorgos–Eastern Khorgos–Easternddd
111111
111111
111111

23 hours ago
Unlock Full Project Details
Khorgos–Eastern Gate International Cargo and Passenger Airport
111111
111111
111111

23 hours ago
Total Investment
Khorgos–Eastern Gate International Cargo and Passenger Airport
111111
111111
111111

23 hours ago
Total Investment