top of page
hero-bg.png

Astana Water Supply System Expansion

Potato Processing Complex.jpg
Photo Sources: cdn.ceecgroup.cn

PROJECT ID

2005202601

SECTOR

Water & Environment & Waste, Infrastructure & Construction

PROJECT PHASE

Procurement & Construction

LOCATION

Astana, Kazakhstan

START DATE

3/31/2025

END DATE

12/31/2028

INVESTMENT VALUE

$ 1400 M

Active

gifyyyyy.gif

Verified

Last Updated: 21 May 2026

Publication: 20 May 2026

PROJECT DESCRIPTION

The project is a large-scale EPC infrastructure development aimed at strengthening the drinking water supply system of Kazakhstan’s capital, Astana. It involves the construction of a 205 km raw water transmission pipeline from the Kanysh Satpaev Canal system to the city of Astana, along with multiple pumping stations and a major water treatment facility (NFS-4). The system is designed to provide long-term water security for a rapidly growing urban population projected to exceed 2 million residents. The project includes water intake structures, booster pumping stations, reservoir systems, and a centralized water purification plant with a capac... Read more

Involved Companies & Contacts

INVOLVED COMPANIES & CONTACTS

COMPANY 1 INFO

COMPANY:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

ROLE:

░░░░░░░░░░░░░░░░░░░░░░░, ░░░░░░░░░░░░░░

ADDRESS:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

PHONE:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

EMAIL:

░░░░░░░░░░░░░░░░░

WEBSITE:

6. party1CompanyWebsiteText

OTHER LINKS:

7. party1CompanyWebsiteText

KEY CONTACTS

NAME:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

POSITION:

░░░░░░░░░░░░░░░

PHONE:

party1Contact1PhoneText

EMAIL:

party1Contact1EmailText

LINK:

party1Contact1LinkText

NAME:

party1Contact2NameText

POSITION:

party1Contact2PositionText

PHONE:

party1Contact2PhoneText

EMAIL:

party1Contact2EmailText

LINK:

party1Contact2LinkText

COMPANY 2 INFO

COMPANY:

░░░░░░░░░░░░░░░░░░░░░░░░░░

ROLE:

░░░░░░░░░░░░░░░░░░░

ADDRESS:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

PHONE:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

EMAIL:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░

WEBSITE:

░░░░░░░░░░░░░░░░░░░░░░░░░░

OTHER LINKS:

7. party1CompanyWebsiteText

KEY CONTACTS

NAME:

party1Contact1NameText

POSITION:

party1Contact1PositionText

PHONE:

party1Contact1PhoneText

EMAIL:

party1Contact1EmailText

LINK:

party1Contact1LinkText

NAME:

party1Contact2NameText

POSITION:

party1Contact2PositionText

PHONE:

party1Contact2PhoneText

EMAIL:

party1Contact2EmailText

LINK:

party1Contact2LinkText

COMPANY 3 INFO

COMPANY:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

ROLE:

░░░░░░░░░░░░░░░░░░░

ADDRESS:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

PHONE:

░░░░░░░░░░░░░░░░░░░░░░░░░░░

EMAIL:

5. party1CompanyEmailText

WEBSITE:

░░░░░░░░░░░░░░░░░░░░░

OTHER LINKS:

7. party1CompanyWebsiteText

KEY CONTACTS

NAME:

party1Contact1NameText

POSITION:

party1Contact1PositionText

PHONE:

party1Contact1PhoneText

EMAIL:

party1Contact1EmailText

LINK:

party1Contact1LinkText

NAME:

party1Contact2NameText

POSITION:

party1Contact2PositionText

PHONE:

party1Contact2PhoneText

EMAIL:

party1Contact2EmailText

LINK:

party1Contact2LinkText

Location

Locations shown on the map are for indicative purposes and may vary from actual locations.

Other important details

  • Water source: Kanysh Satpaev Canal system (surface water abstraction)

  • Annual abstraction: ~102.2 million m³/year

  • Daily capacity: ~280,000 m³/day (system intake)

  • Treatment capacity (NFS-4): 210,000 m³/day

  • Pipeline length: ~205 km

  • Route optimized along existing transport corridors to reduce land impact

  • No viable alternative route identified in environmental filing

  • Public environmental hearings held in 2022 (small-scale local consultation)

  • No transboundary environmental impacts identified (explicitly stated)

  • Project life cycle: ~55 years of operation

  • PB Environmental Solutions LLP acted as the environmental consultant and preparer of the Environmental Impact Assessment (EIA) / “Report on Possible Impacts” documentation:

010000, Astana, Yesil District, Kabanbay Batyr Avenue, Building 6/1.
+7 707 661 36 09

+7 771 998 57 53 Almaty

+7 717 269 61 99 Astana

pbecoresheniya@mail.ru

astana@pbeco.kz

info@pbeco.kz

website: pbeco.kz

Sources

░░░░░░░░░░░░░░

░░░░░░░░░░░░░░

░░░░░░░░░░░░░░

░░░░░░░░░░░░░░

Similar Projects

bottom of page