top of page
hero-bg.png

Apex Packaging Manufacturing Plant

Potato Processing Complex.jpg
Photo Sources:

PROJECT ID

1011202602

SECTOR

Industrial Manufacturing

PROJECT PHASE

Engineering Design & Planning

LOCATION

Kyzylorda Region

START DATE

7/1/2027

END DATE

7/31/2028

INVESTMENT VALUE

$ 8 M

Active

gifyyyyy.gif

Verified

Last Updated: 12 November 2026

Publication: 10 November 2026

PROJECT DESCRIPTION

Apex Packaging LLP plans to establish a polypropylene packaging manufacturing plant in Kyzylorda, Kazakhstan. The facility will produce woven polypropylene sacks and flexible intermediate bulk containers (FIBCs), commonly known as big bags. Its planned annual production capacity includes 12.5 million 30-kg polypropylene sacks without liners and 12.5 million sacks with polyethylene liners. A separate production line will manufacture up to 1.5 million big bags with a load capacity of 1,000 kg each annually. The project involves developing a vertically integrated manufacturing complex covering the entire production cycle from polymer granules to... Read more

Involved Companies & Contacts

INVOLVED COMPANIES & CONTACTS

COMPANY 1 INFO

COMPANY:

░░░░░░░░░░░░░░░░

ROLE:

░░░░░░░░░░░░░░░░░░░░░░░

ADDRESS:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

PHONE:

░░░░░░░░░░░░░░

EMAIL:

5. party1CompanyEmailText

WEBSITE:

6. party1CompanyWebsiteText

OTHER LINKS:

7. party1CompanyWebsiteText

KEY CONTACTS

NAME:

░░░░░░░░░░░░░░░░░░░░░░░░

POSITION:

░░░░░░░░░░░░░░

PHONE:

party1Contact1PhoneText

EMAIL:

░░░░░░░░░░░░░░░░░░░░░░░

LINK:

party1Contact1LinkText

NAME:

party1Contact2NameText

POSITION:

party1Contact2PositionText

PHONE:

party1Contact2PhoneText

EMAIL:

party1Contact2EmailText

LINK:

party1Contact2LinkText

Location

Locations shown on the map are for indicative purposes and may vary from actual locations.

Other important details

The environmental application specifies the following indicative annual requirements:

  • Polypropylene granules: 3,020 tonnes

  • Polyethylene: 1,400 tonnes

  • Calcium carbonate: 91.5 tonnes

  • UV stabilizer and related additives: 30.5 tonnes

  • Printing inks: 28 tonnes

  • Natural gas: 58,400 m³

The estimated construction material requirements include 4,800 m³ of sand, 2,900 m³ of gravel, 4,500 m³ of crushed stone and 3,500 m³ of sand-gravel mixture.


Apex Packaging's registered office address matches the Almaty headquarters address published by Araltuz JSC. The developer's General Director also uses an email address under the araltuz.kz domain.

Sources

░░░░░░░░░░░░░░

░░░░░░░░░░░░░░

░░░░░░░░░░░░░░

░░░░░░░░░░░░░░

Similar Projects

2c603308-f2ff-42da-94e0-d9f04b8c6e81-1024x634_edited.jpg

Khorgos–Eastern Khorgos–Easternddd

111111

111111

111111

t.png

23 hours ago

Unlock Full Project Details

2c603308-f2ff-42da-94e0-d9f04b8c6e81-1024x634_edited.jpg

Khorgos–Eastern Gate International Cargo and Passenger Airport

111111

111111

111111

t.png

23 hours ago

Total Investment

2c603308-f2ff-42da-94e0-d9f04b8c6e81-1024x634_edited.jpg

Khorgos–Eastern Gate International Cargo and Passenger Airport

111111

111111

111111

t.png

23 hours ago

Total Investment

bottom of page