
Ammonia-Urea Complex by KazAzot Prime LLP (Updated)

PROJECT ID
403202601
SECTOR
Chemicals & Petrochemicals
PROJECT PHASE
Engineering Design & Planning
LOCATION
Mangystau Region, Kazakhstan
END DATE
12/31/2029
INVESTMENT VALUE
$ 1565 M
Active
Verified
Last Updated: 10 June 2026
Publication: 10 June 2026
PROJECT DESCRIPTION
The project involves the construction of a large integrated ammonia–urea and nitrogen fertilizer complex in Aktau, Mangystau Region, Kazakhstan. It is officially positioned as the first urea production plant in Kazakhstan, as urea is currently not produced domestically and is imported from neighbouring countries. The Government of Kazakhstan approved the signing of an investment agreement for the project between the Ministry of Industry and Construction and KazAzot PRIME LLP. The planned complex will produce up to 660,000 tonnes of ammonia, about 580,000 tonnes of urea, and 500,000 tonnes of ammonium nitrate per year. Earlier environmental do... Read more
Involved Companies & Contacts
INVOLVED COMPANIES & CONTACTS
COMPANY 1 INFO
COMPANY:
░░░░░░░░░░░░░░░
ROLE:
░░░░░░░░░░░░░░░░░░░░░░░
ADDRESS:
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░ ░░░░
PHONE:
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░
EMAIL:
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░
WEBSITE:
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░
OTHER LINKS:
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░
KEY CONTACTS
NAME:
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░
POSITION:
░░░░░░░░░░░░░░
PHONE:
░░░░░░░░░░░░░░░░
EMAIL:
party1Contact1EmailText
LINK:
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░ ░░░░░░░░░░░░░░░░░░░░░░
NAME:
░░░░░░░░░░░░░░░ ░░░░░░░░░
POSITION:
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░
PHONE:
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░
EMAIL:
░░░░░░░░░░░░░░░░░░░
LINK:
party1Contact2LinkText
COMPANY 2 INFO
COMPANY:
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░
ROLE:
░░░░░░░░░░░░░░░░░░░
ADDRESS:
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░
PHONE:
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░
EMAIL:
5. party1CompanyEmailText
WEBSITE:
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░
OTHER LINKS:
7. party1CompanyWebsiteText
KEY CONTACTS
NAME:
░░░░
POSITION:
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░
PHONE:
party1Contact1PhoneText
EMAIL:
░░░░░░░░░░░░
LINK:
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░
NAME:
party1Contact2NameText
POSITION:
party1Contact2PositionText
PHONE:
party1Contact2PhoneText
EMAIL:
party1Contact2EmailText
LINK:
party1Contact2LinkText
COMPANY 3 INFO
COMPANY:
░░░░░░░░░░░░░░░░░░░░░░░░░░
ROLE:
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░
ADDRESS:
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░ ░░░░░░░░░░░░░░░░░
PHONE:
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░
EMAIL:
░░░░░░░░░░░░░
WEBSITE:
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░
OTHER LINKS:
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░
KEY CONTACTS
NAME:
party1Contact1NameText
POSITION:
party1Contact1PositionText
PHONE:
party1Contact1PhoneText
EMAIL:
party1Contact1EmailText
LINK:
party1Contact1LinkText
NAME:
party1Contact2NameText
POSITION:
party1Contact2PositionText
PHONE:
party1Contact2PhoneText
EMAIL:
party1Contact2EmailText
LINK:
party1Contact2LinkText
Location
Locations shown on the map are for indicative purposes and may vary from actual locations.
Other important details
The environmental documents identify the project as new construction under the chemical industry category for production of nitrogen mineral fertilizers.
The 2023 intended-activity statement lists a project site area of 111 hectares and an intended land-use period of 50 years.
The project’s planned facilities include a central control room, mechanical workshops, distribution substations, a main transformer substation, emergency diesel power plants, a fire station, a gas-rescue service, industrial waste temporary storage, wastewater treatment facilities, internal railway facilities and a pond-evaporator.
A separate road-access project is linked to the complex; available documents indicate a road connection of approximately 2,967.1 metres, IV technical category, two traffic lanes and an expected implementation period of 5 months starting in October 2027.
The project was postponed from its originally targeted commissioning date (initially expected around 2026).
The delay was primarily attributed to restructuring of financing arrangements, revisions to engineering scope, and EPC contractor alignment.
During the early planning stage, the project involved international engineering participation, including Tecnicas Reunidas S.A. in an engineering/FEED capacity and technology licensors such as KBR, Inc. and Toyo Engineering Corporation. However, the final EPC contractor was later confirmed as Wuhuan Engineering Co., Ltd., replacing earlier conceptual EPC expectations following project restructuring and financing adjustments.
The postponement also followed adjustments in global fertilizer market conditions and capital structuring requirements.
The Government of Kazakhstan has identified the project as strategically important for industrial development and fertilizer self-sufficiency.
Sources
░░░░░░░░░░░░░░
░░░░░░░░░░░░░░
░░░░░░░░░░░░░░
░░░░░░░░░░░░░░
