top of page
hero-bg.png

Almaty Ski Tourism Development (Updated)

Potato Processing Complex.jpg
Photo Sources: primeminister.kz

PROJECT ID

2402202601

SECTOR

Tourism & Hospitality

PROJECT PHASE

Procurement & Construction

LOCATION

Kok-Zhaylyau, Almaty, Kazakhstan

START DATE

6/1/2026

END DATE

12/31/2029

INVESTMENT VALUE

$ NA

Active

gifyyyyy.gif

Verified

Last Updated: 6 July 2026

Publication: 4 June 2026

PROJECT DESCRIPTION

Almaty Superski is a planned year-round mountain resort in the Kok-Zhailau area of Almaty, Kazakhstan. The project is located on the northern slope of the Zailiyskiy Alatau within the Almaty Mountain Cluster and is linked to the existing Medeu–Shymbulak recreational corridor. The development is intended to create a large-scale ski and tourism destination with winter and summer operations. According to the environmental documentation, the resort is designed to accommodate up to 15,000 visitors per day, including up to 5,000 skiers and 10,000 pedestrian visitors. The planned transport infrastructure includes 17 lifts in total: 11 cableways, 4 c... Read more

Involved Companies & Contacts

INVOLVED COMPANIES & CONTACTS

COMPANY 1 INFO

COMPANY:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░

ROLE:

░░░░░░░░░░░░░░░░░░░░░░░

ADDRESS:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

PHONE:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

EMAIL:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

WEBSITE:

░░░░░░░░░░░░░░░░░

OTHER LINKS:

7. party1CompanyWebsiteText

KEY CONTACTS

NAME:

░░░░░░░░░░░░░░░░░░░░░░░░░

POSITION:

░░░░░░

PHONE:

party1Contact1PhoneText

EMAIL:

party1Contact1EmailText

LINK:

party1Contact1LinkText

NAME:

party1Contact2NameText

POSITION:

party1Contact2PositionText

PHONE:

party1Contact2PhoneText

EMAIL:

party1Contact2EmailText

LINK:

party1Contact2LinkText

COMPANY 2 INFO

COMPANY:

░░░░░░░░░░░░

ROLE:

░░░░░░░░░░░░░░░░░░░

ADDRESS:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

PHONE:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

EMAIL:

░░░░░░░░░░░░░░

WEBSITE:

░░░░░░░░░░░░░░░░░░░░

OTHER LINKS:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

KEY CONTACTS

NAME:

░░░░░░░░░░░░░░░░░░░░░░

POSITION:

░░░░░░

PHONE:

party1Contact1PhoneText

EMAIL:

░░░░░░░░░░░░░░░

LINK:

party1Contact1LinkText

NAME:

░░░░░░░░░░░░░░░░░░░░░░░░░░

POSITION:

░░░░░░░░░░░░

PHONE:

░░░░░░░░░░░░░

EMAIL:

party1Contact2EmailText

LINK:

party1Contact2LinkText

COMPANY 3 INFO

COMPANY:

░░░░░░░░░░░░░░░░

ROLE:

░░░░░░░░░░░░░░░░░░░

ADDRESS:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

PHONE:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

EMAIL:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

WEBSITE:

░░░░░░░░░░░░░░░░░░░░░░░

OTHER LINKS:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

KEY CONTACTS

NAME:

░░░░░░░░░░░

POSITION:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

PHONE:

party1Contact1PhoneText

EMAIL:

░░░░░░░░░░░░░░░░░░░░░░░

LINK:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

NAME:

░░░░░░░░░░░░

POSITION:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

PHONE:

party1Contact2PhoneText

EMAIL:

░░░░░░░░░░░░░░░░░░░░░░░░

LINK:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

COMPANY 4 INFO

COMPANY:

░░░░░░░░░░░░░░░░░░░░░░░░░░

ROLE:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

ADDRESS:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

PHONE:

░░░░░░░░░░

EMAIL:

░░░░░░░░░░░░

WEBSITE:

░░░░░░░░░░░░░

OTHER LINKS:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

KEY CONTACTS

NAME:

░░░░░░░░░░░░░░░░

POSITION:

*****

PHONE:

party1Contact1PhoneText

EMAIL:

░░░░░░░░░░░░░░░░

LINK:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

NAME:

░░░░░░░░░░░░░░░░░

POSITION:

░░░░░░░░░░░░░░░░░░░░░░░░░░

PHONE:

party1Contact2PhoneText

EMAIL:

░░░░░░░░░░░░░░

LINK:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

COMPANY 5 INFO

COMPANY:

░░░░░░░░░░░░░░░

ROLE:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

ADDRESS:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

PHONE:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

EMAIL:

░░░░░░░░░░░░░░░░░░░░░░░░

WEBSITE:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

OTHER LINKS:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

KEY CONTACTS

NAME:

░░░░░░░░░░░

POSITION:

*****

PHONE:

party1Contact1PhoneText

EMAIL:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

LINK:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

NAME:

░░░░░░░░░

POSITION:

░░░░░░░░░░░░░░░░░░░░

PHONE:

party1Contact2PhoneText

EMAIL:

░░░░░░░░░░░░░░░░░░░░░░░░░░░

LINK:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

Location

Locations shown on the map are for indicative purposes and may vary from actual locations.

Other important details

TOO “RNPTs Kazecology”

Name: TOO “RNPTs Kazecology” / ТОО «РНПИЦ “Казэкология”»
Role: Environmental documentation developer / OOVV developer
Address: Legal address: 36 Aiteke bi Street, Almaty, Kazakhstan; actual address: 27 Aiteke bi Street, Almaty, Kazakhstan.
Phone: +7 727 291 78 14
Email: kazecology.kz@gmail.com; 

contact person: diaskassym@mail.ru / +7 701 111 3609
Website: kazecology.kz

Project relevance:
TOO “RNPTs Kazecology” is responsible for the environmental impact assessment documentation for the working project. The company prepared the OOVV-related materials covering environmental impacts, risks, mitigation measures, waste handling, biodiversity compensation, monitoring and post-project analysis. The contact person listed in the document is Dias Maratovich Kassymbekov, phone +7 701 111 3609.


POMA SAS

Name: POMA SAS
Role: Cableway contractor / selected contractor for 11 modern cableways
Address: 109 rue Aristide Bergès, 38340 Voreppe, France
Phone: +33 4 76 28 70 00
Email: poma.info@poma.net
Website: poma.net
LinkedIn: linkedin.com/company/poma

Project relevance:
POMA was selected through an open tender among cableway manufacturers for the package that includes construction of 11 modern cableways. The official government release states that the planned cableway systems include 3S gondolas, 10-seater gondola lifts and chairlifts. POMA is described by the Government of Kazakhstan as one of the global leaders in the design, production and operation of cable systems, operating since 1936 and having implemented approximately 8,000 projects in 90 countries.


StructureCraft

Name: StructureCraft
Role: Mass timber engineering and timber structure design / production partner
Address: 1929 Foy Street, Abbotsford, British Columbia V2T 6B1, Canada
Phone: +1 604 940 8889
Email: info@structurecraft.com
Website: structurecraft.com
LinkedIn: linkedin.com/company/structurecraft

Project relevance:
StructureCraft was engaged for the design and production quality of modern timber structures used in the project. According to the government announcement, these timber structures are an important element of the architectural concept developed by Foster + Partners. StructureCraft’s role should be shown as mass timber engineering / structural design and production support, not as a general contractor for the whole resort.


The project has a 30-month construction period according to the environmental summary, with construction-stage waste estimated at 122,794.18 tonnes and annual operational waste estimated at 795.32 tonnes per year. Most construction waste is expected to consist of inert materials such as soil, stones, asphalt concrete, mixed construction waste, concrete and brick. Waste burial at the project site is not planned; the stated handling model is temporary accumulation, separate collection and transfer to specialized licensed organizations.

The construction-stage water demand is estimated at up to 67,080 m³ per year, while operational water demand can reach up to 2,700 m³ per day during peak periods. The project also requires a dedicated water supply for artificial snowmaking, with the source identified as the Kazachka River and accumulation in planned reservoirs. Direct discharge of wastewater into surface water bodies is not planned.


The land-use framework is restrictive: the land remains state-owned and is provided for long-term paid use until 27 March 2051 for tourism-related engineering infrastructure. The document states that construction of private houses, estates, villas and cottages is prohibited.


Investment amount for standalone Almaty Superski: not officially disclosed. The approved broader Almaty Mountain Cluster Comprehensive Plan for 2025–2029 is reported at 526 billion tenge, including 190.5 billion tenge from the republican budget, 96.6 billion tenge from the local budget and 238.9 billion tenge from extra-budgetary sources.

Sources

░░░░░░░░░░░░░░

░░░░░░░░░░░░░░

░░░░░░░░░░░░░░

░░░░░░░░░░░░░░

Similar Projects

bottom of page