
Aidarly Copper–Molybdenum Mining and Processing Complex (Updated)

PROJECT ID
120520251
SECTOR
Mining & Metallurgy
PROJECT PHASE
Procurement & Construction
LOCATION
8JRXXX8F+HC
START DATE
6/22/2026
END DATE
12/31/2030
INVESTMENT VALUE
$ 4500 M
Active
Verified
Last Updated: 23 July 2026
Publication: 23 July 2026
PROJECT DESCRIPTION
The Aidarly Copper–Molybdenum Mining and Processing Complex is a large greenfield mining project at the Aidarly deposit in the Ayagoz District of Kazakhstan’s Abay Region. The project combines an open-pit mine with a concentrator designed to process up to 75 million tonnes of ore per year. The latest project announcement states planned annual output of approximately 226,000 tonnes of contained copper and 3,550 tonnes of contained molybdenum in concentrates. The disclosed industrial scope includes the open pit, a crushing complex, a mineral-processing plant, energy, transport and engineering infrastructure, and a rotational workers’ camp. The ... Read more
Involved Companies & Contacts
INVOLVED COMPANIES & CONTACTS
COMPANY 1 INFO
COMPANY:
░░░░░░░░░░░░░░░░
ROLE:
░░░░░░░░░░░░░░
ADDRESS:
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░
PHONE:
░░░░░░░░░░░░░░░░░░░░░░░░
EMAIL:
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░
WEBSITE:
6. party1CompanyWebsiteText
OTHER LINKS:
7. party1CompanyWebsiteText
KEY CONTACTS
NAME:
░░░░░░░░░░░░░
POSITION:
░░░░░░░░░░░░░░
PHONE:
party1Contact1PhoneText
EMAIL:
party1Contact1EmailText
LINK:
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░
NAME:
░░░░░░░░░░░░
POSITION:
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░
PHONE:
party1Contact2PhoneText
EMAIL:
party1Contact2EmailText
LINK:
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░
COMPANY 2 INFO
COMPANY:
░░░░░░░░░░░░░░░░░░░░░
ROLE:
░░░░░░░░░░░░░░░░░░░
ADDRESS:
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░
PHONE:
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░
EMAIL:
░░░░░░░░░░░░░░░░░░░
WEBSITE:
░░░░░░░░░░░░░░░░░░░░░░░
OTHER LINKS:
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░
KEY CONTACTS
NAME:
░░░░░░░░░░░░
POSITION:
*****
PHONE:
party1Contact1PhoneText
EMAIL:
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░
LINK:
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░
NAME:
░░░░░░░░░░░░
POSITION:
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░
PHONE:
party1Contact2PhoneText
EMAIL:
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░
LINK:
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░
Location
Locations shown on the map are for indicative purposes and may vary from actual locations.
Other important details
Aidarly Mining LLP is controlled by Kazakh businessman Eduard Ogai through Koksay Holdings Limited, an AIFC-registered holding company wholly owned by Ogai. Public sources identify Koksay Holdings as the parent or controlling entity of Aidarly Mining, although the exact direct ownership percentage in the LLP is not disclosed in publicly accessible official records.
Jiangxi Naipu Mining Machinery Co., Ltd. officially disclosed that it signed a "Pump and Hydrocyclone Supply Contract" with Aidarly Mining LLP for the supply of slurry pumps, hydrocyclones, mineral-processing equipment, and wear-resistant spare parts. The announcement, published by Naipu as a mandatory stock exchange disclosure on 3 July 2026, confirms Aidarly Mining LLP as the customer and establishes Naipu as a confirmed supplier of mineral-processing equipment for the project.
Sources
░░░░░░░░░░░░░░
░░░░░░░░░░░░░░
░░░░░░░░░░░░░░
░░░░░░░░░░░░░░
