75 MW CCGT Plant at Zhezkazgan CHP (updated)

Potato Processing Complex.jpg
Photo Sources: www.gov.kz

PROJECT ID

1505202513

SECTOR

Energy & Power Generation

PROJECT PHASE

Procurement & Construction

LOCATION

QPPV+6HC Zhezqazghan, Kazakhstan

START DATE

3/5/2025

END DATE

12/31/2027

INVESTMENT VALUE

$ 150 M

Active

gifyyyyy.gif

Verified

Last Updated: 25 October 2026

Publication: 23 October 2026

PROJECT DESCRIPTION

The project involves the construction of a new 75 MW combined-cycle gas turbine (CCGT) power unit at the existing Zhezkazgan Combined Heat and Power Plant in Kazakhstan's Ulytau Region. It is classified as new construction within an operating industrial complex rather than refurbishment of an existing generating unit. The facility is designed to increase electricity generation capacity and improve power supply reliability for industrial facilities and other consumers in the region. The planned generating configuration comprises one gas turbine, one heat recovery steam generator and one condensing steam turbine. Natural gas will be supplied th... Read more

Involved Companies & Contacts

INVOLVED COMPANIES & CONTACTS

COMPANY 1 INFO

COMPANY:

░░░░░░░░░░░░░░░░░░░

ROLE:

░░░░░░░░░░░░░░░░░░░░░░░

ADDRESS:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

PHONE:

░░░░░░░░░░░░░░░░

EMAIL:

░░░░░░░░░░░░░░░░░░░░░░░░░░░

WEBSITE:

░░░░░░░░░░░░░░░░░░░░░░░░

OTHER LINKS:

7. party1CompanyWebsiteText

KEY CONTACTS

NAME:

░░░░░░░░░░░░░░░░

POSITION:

░░░░░░░░░░░░

PHONE:

░░░░░░░░░░░░░░░░

EMAIL:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

LINK:

party1Contact1LinkText

NAME:

░░░░░░░░░░░░

POSITION:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

PHONE:

░░░░░░░░░░░░░░░░

EMAIL:

░░░░░░░░░░░░░░░░░░░░░░░░░

LINK:

party1Contact2LinkText

COMPANY 2 INFO

COMPANY:

░░░░░░░░░░░░░░░░░░░░░

ROLE:

░░░░░░░░░░░░░░░░░░░

ADDRESS:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

PHONE:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

EMAIL:

░░░░░░░░░░░░░░░░░░░

WEBSITE:

░░░░░░░░░░░░░░░░░░░░░░░

OTHER LINKS:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

KEY CONTACTS

NAME:

░░░░░░░░░░░░

POSITION:

*****

PHONE:

party1Contact1PhoneText

EMAIL:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

LINK:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

NAME:

░░░░░░░░░░░░

POSITION:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

PHONE:

party1Contact2PhoneText

EMAIL:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

LINK:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

COMPANY 3 INFO

COMPANY:

░░░░░░░░░░░░░░░░░░░░

ROLE:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

ADDRESS:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

PHONE:

░░░░░░░░░░░░░░░░

EMAIL:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

WEBSITE:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

OTHER LINKS:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

KEY CONTACTS

NAME:

░░░░░░░░░░░░░

POSITION:

*****

PHONE:

party1Contact1PhoneText

EMAIL:

░░░░░░░░░░░░░░░░

LINK:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

NAME:

░░░░░░░░░░░░░░░░░░

POSITION:

░░░░░░░░░░░░░░░░░░░░░

PHONE:

party1Contact2PhoneText

EMAIL:

party1Contact2EmailText

LINK:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

Location

Locations shown on the map are for indicative purposes and may vary from actual locations.

Other important details

1. Astel-K LLP — Design Engineering Contractor

Astel-K prepared the Project Construction Organization Plan (POS) for the 75 MW Zhezkazgan CCGT project in 2026. The documentation identifies Aidar Mailybayev as Director and A. O. Mashakevich as Chief Project Engineer.

Source: Official Project Construction Organization Plan, 2026

2. Energo Tekhnologiya LLC — Design Engineering Subcontractor

Energo Tekhnologiya was engaged by Astel-K LLP to perform design engineering works for the 75 MW CCGT project. The company identifies December 2025–August 2026 as the scheduled design work period in its official project portfolio.

Source: Energo Tekhnologiya — Official Project Portfolio

3. Siemens Energy AB — Equipment Manufacturer

The Development Bank of Kazakhstan confirmed in June 2026 that equipment manufactured by Siemens Energy AB would be used for the new CCGT facility. The specific equipment supply agreement and full contractual scope have not been publicly disclosed.

Source: Development Bank of Kazakhstan, 16 June 2026

4. Harbin Electric International Company Limited (HEI) — Equipment Manufacturer

Harbin Electric International was identified by the Development Bank of Kazakhstan as another equipment manufacturer involved in the project. The exact equipment package, contractual responsibilities and delivery schedule have not been publicly confirmed.

Source: Development Bank of Kazakhstan, 16 June 2026

5. Development Bank of Kazakhstan JSC (DBK) — Project Financing

In June 2026, DBK signed a CNY 788.9 million credit facility agreement with Kazakhmys Energy to finance equipment procurement, construction and commissioning works. In July 2026, DBK signed a sub-loan agreement with China Development Bank to support the project's financing.

Sources: DBK Financing Agreement, 16 June 2026 | China Development Bank Agreement, 17 July 2026

6. Eco-Logic — Environmental Documentation Consultant

Eco-Logic prepared environmental documentation associated with the Zhezkazgan CHP and the new 75 MW CCGT unit, including materials for the 2026–2028 environmental permitting process. Environmental Design Specialist Natalya Shiryaeva represented the consultant in responses to public comments during the August 2026 environmental hearings.

Source: Government Environmental Hearings Registry, August 2026

Sources

░░░░░░░░░░░░░░

░░░░░░░░░░░░░░

░░░░░░░░░░░░░░

░░░░░░░░░░░░░░

Similar Projects

2c603308-f2ff-42da-94e0-d9f04b8c6e81-1024x634_edited.jpg

Khorgos–Eastern Khorgos–Easternddd

111111

111111

111111

t.png

23 hours ago

Unlock Full Project Details

2c603308-f2ff-42da-94e0-d9f04b8c6e81-1024x634_edited.jpg

Khorgos–Eastern Gate International Cargo and Passenger Airport

111111

111111

111111

t.png

23 hours ago

Total Investment

2c603308-f2ff-42da-94e0-d9f04b8c6e81-1024x634_edited.jpg

Khorgos–Eastern Gate International Cargo and Passenger Airport

111111

111111

111111

t.png

23 hours ago

Total Investment

bottom of page