75 MW CCGT Plant at Zhezkazgan CHP (updated)

PROJECT ID
1505202513
SECTOR
Energy & Power Generation
PROJECT PHASE
Procurement & Construction
LOCATION
QPPV+6HC Zhezqazghan, Kazakhstan
START DATE
3/5/2025
END DATE
12/31/2027
INVESTMENT VALUE
$ 150 M
Active
Verified
Last Updated: 25 October 2026
Publication: 23 October 2026
PROJECT DESCRIPTION
The project involves the construction of a new 75 MW combined-cycle gas turbine (CCGT) power unit at the existing Zhezkazgan Combined Heat and Power Plant in Kazakhstan's Ulytau Region. It is classified as new construction within an operating industrial complex rather than refurbishment of an existing generating unit. The facility is designed to increase electricity generation capacity and improve power supply reliability for industrial facilities and other consumers in the region. The planned generating configuration comprises one gas turbine, one heat recovery steam generator and one condensing steam turbine. Natural gas will be supplied th... Read more
Involved Companies & Contacts
INVOLVED COMPANIES & CONTACTS
COMPANY 1 INFO
COMPANY:
░░░░░░░░░░░░░░░░░░░
ROLE:
░░░░░░░░░░░░░░░░░░░░░░░
ADDRESS:
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░
PHONE:
░░░░░░░░░░░░░░░░
EMAIL:
░░░░░░░░░░░░░░░░░░░░░░░░░░░
WEBSITE:
░░░░░░░░░░░░░░░░░░░░░░░░
OTHER LINKS:
7. party1CompanyWebsiteText
KEY CONTACTS
NAME:
░░░░░░░░░░░░░░░░
POSITION:
░░░░░░░░░░░░
PHONE:
░░░░░░░░░░░░░░░░
EMAIL:
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░
LINK:
party1Contact1LinkText
NAME:
░░░░░░░░░░░░
POSITION:
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░
PHONE:
░░░░░░░░░░░░░░░░
EMAIL:
░░░░░░░░░░░░░░░░░░░░░░░░░
LINK:
party1Contact2LinkText
COMPANY 2 INFO
COMPANY:
░░░░░░░░░░░░░░░░░░░░░
ROLE:
░░░░░░░░░░░░░░░░░░░
ADDRESS:
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░
PHONE:
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░
EMAIL:
░░░░░░░░░░░░░░░░░░░
WEBSITE:
░░░░░░░░░░░░░░░░░░░░░░░
OTHER LINKS:
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░
KEY CONTACTS
NAME:
░░░░░░░░░░░░
POSITION:
*****
PHONE:
party1Contact1PhoneText
EMAIL:
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░
LINK:
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░
NAME:
░░░░░░░░░░░░
POSITION:
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░
PHONE:
party1Contact2PhoneText
EMAIL:
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░
LINK:
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░
COMPANY 3 INFO
COMPANY:
░░░░░░░░░░░░░░░░░░░░
ROLE:
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░
ADDRESS:
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░
PHONE:
░░░░░░░░░░░░░░░░
EMAIL:
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░
WEBSITE:
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░
OTHER LINKS:
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░
KEY CONTACTS
NAME:
░░░░░░░░░░░░░
POSITION:
*****
PHONE:
party1Contact1PhoneText
EMAIL:
░░░░░░░░░░░░░░░░
LINK:
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░
NAME:
░░░░░░░░░░░░░░░░░░
POSITION:
░░░░░░░░░░░░░░░░░░░░░
PHONE:
party1Contact2PhoneText
EMAIL:
party1Contact2EmailText
LINK:
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░
Location
Locations shown on the map are for indicative purposes and may vary from actual locations.
Other important details
1. Astel-K LLP — Design Engineering Contractor
Astel-K prepared the Project Construction Organization Plan (POS) for the 75 MW Zhezkazgan CCGT project in 2026. The documentation identifies Aidar Mailybayev as Director and A. O. Mashakevich as Chief Project Engineer.
Source: Official Project Construction Organization Plan, 2026
2. Energo Tekhnologiya LLC — Design Engineering Subcontractor
Energo Tekhnologiya was engaged by Astel-K LLP to perform design engineering works for the 75 MW CCGT project. The company identifies December 2025–August 2026 as the scheduled design work period in its official project portfolio.
Source: Energo Tekhnologiya — Official Project Portfolio
3. Siemens Energy AB — Equipment Manufacturer
The Development Bank of Kazakhstan confirmed in June 2026 that equipment manufactured by Siemens Energy AB would be used for the new CCGT facility. The specific equipment supply agreement and full contractual scope have not been publicly disclosed.
Source: Development Bank of Kazakhstan, 16 June 2026
4. Harbin Electric International Company Limited (HEI) — Equipment Manufacturer
Harbin Electric International was identified by the Development Bank of Kazakhstan as another equipment manufacturer involved in the project. The exact equipment package, contractual responsibilities and delivery schedule have not been publicly confirmed.
Source: Development Bank of Kazakhstan, 16 June 2026
5. Development Bank of Kazakhstan JSC (DBK) — Project Financing
In June 2026, DBK signed a CNY 788.9 million credit facility agreement with Kazakhmys Energy to finance equipment procurement, construction and commissioning works. In July 2026, DBK signed a sub-loan agreement with China Development Bank to support the project's financing.
Sources: DBK Financing Agreement, 16 June 2026 | China Development Bank Agreement, 17 July 2026
6. Eco-Logic — Environmental Documentation Consultant
Eco-Logic prepared environmental documentation associated with the Zhezkazgan CHP and the new 75 MW CCGT unit, including materials for the 2026–2028 environmental permitting process. Environmental Design Specialist Natalya Shiryaeva represented the consultant in responses to public comments during the August 2026 environmental hearings.
Source: Government Environmental Hearings Registry, August 2026
Sources
░░░░░░░░░░░░░░
░░░░░░░░░░░░░░
░░░░░░░░░░░░░░
░░░░░░░░░░░░░░
Similar Projects
Khorgos–Eastern Khorgos–Easternddd
111111
111111
111111

23 hours ago
Unlock Full Project Details
Khorgos–Eastern Gate International Cargo and Passenger Airport
111111
111111
111111

23 hours ago
Total Investment
Khorgos–Eastern Gate International Cargo and Passenger Airport
111111
111111
111111

23 hours ago
Total Investment