top of page
hero-bg.png

1 GW Wind Power Plant in Zhambyl Region

Potato Processing Complex.jpg
Photo Sources: samruk-energy.kz

PROJECT ID

172025178

SECTOR

Energy & Power Generation, Renewable Energy

PROJECT PHASE

Engineering Design & Planning

LOCATION

Jambyl Region, Kazakhstan

START DATE

1/1/2026

END DATE

12/31/2029

INVESTMENT VALUE

$ 1400 M

Active

gifyyyyy.gif

Verified

Last Updated: 25 April 2026

Publication: 12 September 2025

PROJECT DESCRIPTION

Masdar, a renewable energy company from the United Arab Emirates (UAE), intends to build a 1 GW wind power plant in the Zhambyl region of Kazakhstan. The Governor of Zhambyl region, Yerbol Karashukeyev, met with representatives of Masdar to discuss the details of the project implementation. Ernur Zhienbayev, Masdar’s project manager, reported on preliminary results, noting that the initial cost of the project is about USD 1.40 billion. The company is currently conducting engineering and geological surveys at the site of the future wind power plant. The project provides for equipping the facility with an energy storage system based on batterie... Read more

Involved Companies & Contacts

INVOLVED COMPANIES & CONTACTS

COMPANY 1 INFO

COMPANY:

░░░░

ROLE:

░░░░░░░░░░░░░░░░░░░░░░░

ADDRESS:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

PHONE:

EMAIL:

░░░░░░░░░░░░

WEBSITE:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

OTHER LINKS:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

KEY CONTACTS

NAME:

░░░░░░░░░░░

POSITION:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

PHONE:

party1Contact1PhoneText

EMAIL:

░░░░░░░░░░░░░░

LINK:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

NAME:

party1Contact2NameText

POSITION:

party1Contact2PositionText

PHONE:

party1Contact2PhoneText

EMAIL:

party1Contact2EmailText

LINK:

party1Contact2LinkText

COMPANY 2 INFO

COMPANY:

░░░░░░░░░░░░░░░

ROLE:

░░░░░░░░░░░░░░░░░░░░░░░

ADDRESS:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

PHONE:

EMAIL:

░░░░░░░░░░░░░░░░░░░

WEBSITE:

░░░░░░░░░░░░░░░░░░░░░░░░░

OTHER LINKS:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

KEY CONTACTS

NAME:

░░░░░░░░░░░░░░░

POSITION:

░░░░░░░░░░░░░░░░

PHONE:

party1Contact1PhoneText

EMAIL:

░░░░░░░░░░░░░░░░░░░░░░░░░░

LINK:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

NAME:

░░░░░░░░░░░░░░░░░░░░░

POSITION:

░░░░░░░░░░░░░░░░░░░░░░░░░░░

PHONE:

party1Contact2PhoneText

EMAIL:

party1Contact2EmailText

LINK:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

COMPANY 3 INFO

COMPANY:

░░░░░░░░░░░░░░░░░░░

ROLE:

░░░░░░░░░░░░

ADDRESS:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

░░░░░░░░░░░░░░░░

PHONE:

EMAIL:

░░░░░░░░░░░░░░░░

WEBSITE:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

OTHER LINKS:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

KEY CONTACTS

NAME:

░░░░░░

POSITION:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

PHONE:

party1Contact1PhoneText

EMAIL:

░░░░░░░░░░░░░░░░░░░░░░░░░░

LINK:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

NAME:

░░░░░░░░░░░░░░░░░░

POSITION:

░░░░░░░░░░░░░░░░░░

PHONE:

party1Contact2PhoneText

EMAIL:

party1Contact2EmailText

LINK:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

COMPANY 4 INFO

COMPANY:

░░░░░

ROLE:

2. party1RoleRepeater

ADDRESS:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

░░░░░░░░░░░░

PHONE:

EMAIL:

░░░░░░░░░░░░░░

WEBSITE:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

OTHER LINKS:

7. party1CompanyWebsiteText

KEY CONTACTS

NAME:

party1Contact1NameText

POSITION:

party1Contact1PositionText

PHONE:

party1Contact1PhoneText

EMAIL:

party1Contact1EmailText

LINK:

party1Contact1LinkText

NAME:

party1Contact2NameText

POSITION:

party1Contact2PositionText

PHONE:

party1Contact2PhoneText

EMAIL:

party1Contact2EmailText

LINK:

party1Contact2LinkText

Location

Locations shown on the map are for indicative purposes and may vary from actual locations.

Other important details

  • Chairman of the Management Board of Samruk-Energo JSC Kairat Maksutov held a meeting with Abdullah Zayed, Director of Development and Investments at Masdar. The parties discussed key aspects of the start of construction of a large 1 GW wind power plant in Zhambyl region, including the start date of construction work. A separate point of negotiations was the issue of preparing for the conclusion of an EPC contract, which is necessary for a timely transition to the practical phase of the project.


  • Suhail Mohamed Al Mazrouei, UAE Minister of Energy and Infrastructure, said:

Today marks an important milestone for the UAE and Kazakhstan and highlights the strength of our strategic partnership. We are proud to support Kazakhstan’s net-zero ambitions while in pursuit of implementing the key pillar of the historic UAE Consensus of tripling global renewable energy by 2030.

  •  Almassadam Satkaliyev, Minister of Energy of the Republic of Kazakhstan, said:

Providing 1GW of clean, emissions-free energy, wind farm in the Jambyl region demonstrates the scale of Kazakhstan's renewable energy ambitions. We are committed to achieving our net zero by 2060 target and pleased to be collaborating with the UAE and Masdar to accelerate the energy transition in Kazakhstan.

  • Dzhienbayev stressed thatthe Emirati company expects to expand its presence in Zhambyl region and implement other investment projects inthe sectors of the green economy.

Sources

░░░░░░░░░░░░░░

░░░░░░░░░░░░░░

░░░░░░░░░░░░░░

░░░░░░░░░░░░░░

Similar Projects

bottom of page