Message

UCC Holding's 1100 MW CCGT Power Plant Project (Updated)

Value
PROJECT ID
150520256
SECTOR
Energy & Power Generation
PROJECT PHASE
Engineering Design & Planning
LOCATION
Syrdariya District, Kazakhstan
START DATE
7/1/2026
END DATE
12/31/2030
INVESTMENT VALUE
$ 2400 M
Active
Verified
Updated: 2 Days ago
Publication: May 8, 2026
Project Description
The project involves the construction of a large-scale combined cycle gas turbine (CCGT) power plant with a planned capacity of approximately 1,100 MW in the Kyzylorda Region of Kazakhstan. The plant is designed as a high-efficiency gas-fired power generation facility intended to... Read more
Involved Companies & Contacts
Involved Companies & Contacts
Company:
1. party1CompanyNameText
Role:
2. party1RoleRepeater
Address:
3. party1CompanyAddressText
Phone:
4. party1CompanyPhoneText
Email:
5. party1CompanyEmailText
Other links:
7. party1CompanyWebsiteText
Website:
6. party1CompanyWebsiteText
Key Contacts 1
Name:
party1Contact1NameText
Position:
party1Contact1PositionText
Phone:
party1Contact1PhoneText
Email:
party1Contact1EmailText
Links:
party1Contact1LinkText
Key Contacts 2
Name:
party1Contact2NameText
Position:
party1Contact2PositionText
Phone:
party1Contact2PhoneText
Email:
party1Contact2EmailText
Links:
party1Contact2LinkText
PARTY 1 - Involved Companies & Contacts
companyTable
Field | Value |
|---|---|
Company | ░░░░░░░░░ |
Role | ░░░░░░░░░░░░░░░░░░░░░░░ |
Address | ░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░ |
Phone | ░░░░░░░░░░░░░░░░░░░░░░░░░░░ |
Email | ░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░ |
Website | ░░░░░░░░░░░░░░░░░░░░░░░░ |
Other Links | ░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░ |
contact1Table
Field | Value |
|---|---|
Name | ░░░░░░░░░░ |
Position | ░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░ |
Phone | NA |
Email | ░░░░░░░░░░░░░░░░░░░░░░░░░░░░░ |
Links | ░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░ |
contact2Table
Field | Value |
|---|---|
Name | ░░░░░░░░░░░░░ |
Position | ░░░░░░░░░░░░░░░░░░░░░░░░░░░░ |
Phone | NA |
Email | ░░░░░░░░░░░░░░░░░░░░░░░░░░░░ |
Links | ░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░ |
PARTY 2 - Involved Companies & Contacts
companyTable
Field | Value |
|---|---|
Company | ░░░░░░░░░░░░░░░░░ |
Role | ░░░░░░░░░░░░░░░░░░░░░░░ |
Address | ░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░ |
Phone | ░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░ |
Email | ░░░░░░░░░░░░░░░░░░░ |
Website | ░░░░░░░░░░░░░░░░░░░░░░░░░░ |
Other Links | ░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░ |
contact1Table
Field | Value |
|---|---|
Name | ░░░░░░░░░░░░░░░░░░░░░░░░░░░░ |
Position | ░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░ |
Phone | ░░░░░░░░░░░░░░░ |
Email | ░░░░░░░░░░░░░░░░░░░░░░░░ |
Links | NA |
contact2Table
Field | Value |
|---|---|
Name | ░░░░░░░░░░░ |
Position | ░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░ |
Phone | ░░░░░░░░░░░░░ |
Email | ░░░░░░░░░░░░░░░░░░░░░░░░░░░ |
Links | NA |
PARTY 3 - Involved Companies & Contacts
companyTable
Field | Value |
|---|---|
Company | ░░░░░░░░░░░░░░░░░░░ |
Role | ░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░ |
Address | ░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░ |
Phone | NA |
Email | NA |
Website | NA |
Other Links | NA |
contact1Table
Field | Value |
|---|---|
Name | ░░░░░░░░░░ |
Position | ***** |
Phone | NA |
Email | ░░░░░░░░░░░░░░░░░░░░░░░░░░░░░ |
Links | ░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░ |
contact2Table
Field | Value |
|---|---|
Name | NA |
Position | NA |
Phone | NA |
Email | NA |
Links | NA |
Company:
Value
Role:
Value
Address:
Value
Phone:
Value
Email:
Value
Website:
Value
Other links:
Value
Key Contacts
Name:
Value
Position:
Value
Phone:
Value
Value
Links:
Value
Phone:
Value
Value
Email:
Position:
Value
Name:
Value
Links:
Value
Email:
Company:
VALUE
Phone:
Value
Email:
Value
Address:
Value
Role:
Value
Website:
Value
Other links:
Value
Phone:
Value
Value
Email:
Name:
Value
Position:
Value
Links:
Value
Key Contacts
Phone:
Value
Email:
Value
Links:
Value
Name:
Value
Position:
Value
Company:
VALUE
Email:
Value
Phone:
Value
Address:
Value
Other links:
Value
Role:
Value
Website:
Value
Phone:
Value
Email:
Value
Name:
Value
Position:
Value
Links:
Value
Key Contacts
Phone:
Value
Email:
Value
Name:
Value
Position:
Value
Links:
Value
Company:
VALUE
Phone:
Value
Email:
Value
Address:
Value
Website:
Value
Role:
Value
Other links:
Value
Value
Phone:
Email:
Value
Name:
Value
Position:
Value
Links:
Value
Key Contacts
Phone:
Value
Email:
Value
Name:
Value
Position:
Value
Links:
Value
Other important details
Technology options reviewed: Siemens, Ansaldo Energia, Mitsubishi, Dongfang Electric Corporation, and General Electric were considered during the feasibility work. The preferred configuration in the feasibility study is listed as Siemens SGT5-4000F gas turbines with SST-3000 steam turbines.
A comparative assessment of water supply options showed a strong economic preference for groundwater wells: the estimated cost of the well-based solution is approximately USD 1 million, compared to about USD 14.3 million for constructing a water intake and pipeline system from the Syr Darya River.
The project is designed primarily for electricity generation and grid support; the plant is not intended to provide district heating or urban heat supply services.
The CCGT facility is intended to provide flexible / dispatchable generation capacity to support balancing and stability of Kazakhstan’s southern and central power zones, rather than serving solely as a conventional baseload power plant.
The project ownership structure is based on a joint venture model: Samruk-Energy holds 30%, while UCC Qazaqstan 3 LLC holds 70% through the dedicated project company Kyzylorda Energy Ltd.
Sources
Publication Date
5/21/2026