top of page

Message

hero-bg.png

Main Ethane and Propane Pipelines (Tengiz-Karabatan) Updated

Potato Processing Complex.jpg

Value

PROJECT ID

172025177

SECTOR

Oil & Gas

PROJECT PHASE

Procurement & Construction

LOCATION

Karabatan, Kazakhstan

START DATE

1/1/2026

END DATE

12/31/2028

INVESTMENT VALUE

$ 5300 M

Active

Verified

Updated: 2 Days ago

Publication: May 8, 2026

Project Description

Kazakhstan’s oil and gas chemical industry is actively developing, with large investment projects being implemented. At present, the country already operates the KPI polypropylene plant. The main feedstock – propane from Tengiz – is delivered to the KPI plant by rail. However, et... Read more

Involved Companies & Contacts

Involved Companies & Contacts

Company:

1. party1CompanyNameText

Role:

2. party1RoleRepeater

Address:

3. party1CompanyAddressText

Phone:

4. party1CompanyPhoneText

Email:

5. party1CompanyEmailText

Other links:

7. party1CompanyWebsiteText

Website:

6. party1CompanyWebsiteText

Key Contacts 1

Name:

party1Contact1NameText

Position:

party1Contact1PositionText

Phone:

party1Contact1PhoneText

Email:

party1Contact1EmailText

Links:

party1Contact1LinkText

Key Contacts 2

Name:

party1Contact2NameText

Position:

party1Contact2PositionText

Phone:

party1Contact2PhoneText

Email:

party1Contact2EmailText

Links:

party1Contact2LinkText

PARTY 1 - Involved Companies & Contacts

Field
Value
Company

░░░░░░░░░░░░░░░

Role

░░░░░░░░░░░░░░░░░░░░░░░

Address

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

Phone

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

Email

░░░░░░░░░░░░░░░░░░

Website

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

Other Links

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

companyTable

Field
Value
Name

░░░░░░░░░░░░░░░░

Position

░░░░░░░░░░░░░░░░░░░░░░░

Phone

NA

Email

░░░░░░░░░░░░░░░░░░░░░░░░

Links

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

contact1Table

contact2Table

Field
Value
Name

░░░░░░░░░░░░

Position

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

Phone

NA

Email

░░░░░░░░░░░░░░░░░░░░░░░░

Links

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

PARTY 2 - Involved Companies & Contacts

Field
Value
Company

░░░░░░░░░░░░░░░░░░░░

Role

░░░░░░░░░░░░░░░░░░░░░░░

Address

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

Phone

░░░░░░░░░░░░

Email

░░░░░░░░░░░░░░

Website

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

Other Links

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

companyTable

Field
Value
Name

NA

Position

NA

Phone

NA

Email

NA

Links

NA

contact1Table

contact2Table

Field
Value
Name

NA

Position

NA

Phone

NA

Email

NA

Links

NA

PARTY 3 - Involved Companies & Contacts

Field
Value
Company

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

Role

░░░░░░░░░░░░░░░░░░░

Address

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

Phone

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

Email

NA

Website

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

Other Links

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

companyTable

Field
Value
Name

NA

Position

NA

Phone

NA

Email

NA

Links

NA

contact1Table

contact2Table

Field
Value
Name

NA

Position

NA

Phone

NA

Email

NA

Links

NA

PARTY 4 - Involved Companies & Contacts

Field
Value
Company

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

Role

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

Address

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

Phone

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

Email

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

Website

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

Other Links

NA

companyTable

Field
Value
Name

░░░░░░░░░░

Position

░░░░░░

Phone

NA

Email

NA

Links

NA

contact1Table

contact2Table

Field
Value
Name

░░░░░░░░░░░░░░░░

Position

░░░░░░░░░░░░░

Phone

NA

Email

NA

Links

NA

PARTY 5 - Involved Companies & Contacts

Field
Value
Company

░░░░░░░░░░░░░░░░░░░░░░░░░

Role

░░░░░░

Address

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

Phone

░░░░░░░░░░░░░░

Email

░░░░░░░░░░░░

Website

░░░░░░░░░░░░░░░░░░░░░░░░░░░░

Other Links

NA

companyTable

Field
Value
Name

░░░░░░░

Position

░░░░░░░░░░░░░░░░░░░░

Phone

NA

Email

NA

Links

NA

contact1Table

contact2Table

Field
Value
Name

NA

Position

NA

Phone

NA

Email

NA

Links

NA

Company:

Value

Role:

Value

Address:

Value

Phone:

Value

Email:

Value

Website:

Value

Other links:

Value

Key Contacts

Name:

Value

Position:

Value

Phone:

Value

Value

Links:

Value

Phone:

Value

Value

Email:

Position:

Value

Name:

Value

Links:

Value

Email:

Company:

VALUE

Phone:

Value

Email:

Value

Address:

Value

Role:

Value

Website:

Value

Other links:

Value

Phone:

Value

Value

Email:

Name:

Value

Position:

Value

Links:

Value

Key Contacts

Phone:

Value

Email:

Value

Links:

Value

Name:

Value

Position:

Value

Company:

VALUE

Email:

Value

Phone:

Value

Address:

Value

Other links:

Value

Role:

Value

Website:

Value

Phone:

Value

Email:

Value

Name:

Value

Position:

Value

Links:

Value

Key Contacts

Phone:

Value

Email:

Value

Name:

Value

Position:

Value

Links:

Value

Company:

VALUE

Phone:

Value

Email:

Value

Address:

Value

Website:

Value

Role:

Value

Other links:

Value

Value

Phone:

Email:

Value

Name:

Value

Position:

Value

Links:

Value

Key Contacts

Phone:

Value

Email:

Value

Name:

Value

Position:

Value

Links:

Value

Other important details

  • Workforce: More than 500 workers will be involved during the construction phase. Around 170 specialists, including qualified local personnel, are expected during the operation period.

  • Project Stages: The completion of the feasibility study paves the way for the design and construction of the main pipelines. The project will create a single technological chain (GSC – Main Pipelines – Petrochemical Plants) for efficient processing and transportation of high-value products.

  • Cryogenic Risks: In case of product release, temperatures can drop sharply to –100 °C for ethane and slightly lower for propane. Strict compliance with material, equipment, and operational requirements is needed to prevent cryogenic points and accidents.

  • Pipeline Installation and Protection: The pipeline will be laid underground at a depth of up to 1.5 m. Factory-applied insulation with reinforced external protection and additional insulation for welded joints will be used, along with standard measures for electrochemical protection and safety along the entire route.

bottom of page