top of page

Message

hero-bg.png

Dredging Operations in the Port of Aktau

Potato Processing Complex.jpg

Value

PROJECT ID

1505202601

SECTOR

Logistics & Transport, Infrastructure & Construction

PROJECT PHASE

Engineering Design & Planning

LOCATION

Aktau, Kazakhstan

INVESTMENT VALUE

$ 43 M

Active

Verified

Updated: 2 Days ago

Publication: May 8, 2026

Project Description

The project involves dredging operations in the water area and approach channels of the Port of Aktau in Kazakhstan. It is designed to deepen the seabed to maintain and improve navigability for cargo ships, including tankers and container vessels operating on the Caspian Sea. The... Read more

Involved Companies & Contacts

Involved Companies & Contacts

Company:

1. party1CompanyNameText

Role:

2. party1RoleRepeater

Address:

3. party1CompanyAddressText

Phone:

4. party1CompanyPhoneText

Email:

5. party1CompanyEmailText

Other links:

7. party1CompanyWebsiteText

Website:

6. party1CompanyWebsiteText

Key Contacts 1

Name:

party1Contact1NameText

Position:

party1Contact1PositionText

Phone:

party1Contact1PhoneText

Email:

party1Contact1EmailText

Links:

party1Contact1LinkText

Key Contacts 2

Name:

party1Contact2NameText

Position:

party1Contact2PositionText

Phone:

party1Contact2PhoneText

Email:

party1Contact2EmailText

Links:

party1Contact2LinkText

PARTY 1 - Involved Companies & Contacts

companyTable

Field
Value
Company

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

Role

░░░░░░░░░░░░░░

Address

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

Phone

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

Email

░░░░░░░░░░░░░░░░░░░░

Website

░░░░░░░░░░░░░░░░░░░░░░

Other Links

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

contact1Table

Field
Value
Name

░░░░░░░░░░░░░░░░░░░░░░░░

Position

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

Phone

░░░░░░░░░░░░░░░░

Email

░░░░░░░░░░░░░░░░░░░░░

Links

NA

contact2Table

Field
Value
Name

░░░░░░░░░░░░░░░░░░░░░░░░░

Position

░░░░░░░░░░░░░░░░░░░░░░░░░░░

Phone

░░░░░░░░░░░░░░░░

Email

░░░░░░░░░░░░░░░░░░░░░

Links

NA

PARTY 2 - Involved Companies & Contacts

companyTable

Field
Value
Company

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

Role

░░░░░░░░░░░░░░░░░░░

Address

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

Phone

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

Email

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

Website

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

Other Links

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

contact1Table

Field
Value
Name

*****

Position

░░░░░░░░░░░░░░░░░░░░░░░░░░░

Phone

NA

Email

NA

Links

NA

contact2Table

Field
Value
Name

░░░░░░░░░░░░░

Position

░░░░░░░░░░░░░░░░░░░░░░░░

Phone

NA

Email

NA

Links

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

Company:

Value

Role:

Value

Address:

Value

Phone:

Value

Email:

Value

Website:

Value

Other links:

Value

Key Contacts

Name:

Value

Position:

Value

Phone:

Value

Value

Links:

Value

Phone:

Value

Value

Email:

Position:

Value

Name:

Value

Links:

Value

Email:

Company:

VALUE

Phone:

Value

Email:

Value

Address:

Value

Role:

Value

Website:

Value

Other links:

Value

Phone:

Value

Value

Email:

Name:

Value

Position:

Value

Links:

Value

Key Contacts

Phone:

Value

Email:

Value

Links:

Value

Name:

Value

Position:

Value

Company:

VALUE

Email:

Value

Phone:

Value

Address:

Value

Other links:

Value

Role:

Value

Website:

Value

Phone:

Value

Email:

Value

Name:

Value

Position:

Value

Links:

Value

Key Contacts

Phone:

Value

Email:

Value

Name:

Value

Position:

Value

Links:

Value

Company:

VALUE

Phone:

Value

Email:

Value

Address:

Value

Website:

Value

Role:

Value

Other links:

Value

Value

Phone:

Email:

Value

Name:

Value

Position:

Value

Links:

Value

Key Contacts

Phone:

Value

Email:

Value

Name:

Value

Position:

Value

Links:

Value

Other important details

  • The Aktau Port dredging project was initiated mainly due to declining Caspian Sea water levels and sediment accumulation reducing navigation depth.

  • Reduced depth limited the draft capacity of tankers, cargo vessels, and container ships entering the port.

  • The project aims to restore safe navigation and improve cargo-loading efficiency at Aktau Port.

  • The dredging program is strategically linked to the development of the Trans-Caspian International Transport Route (Middle Corridor).

  • Aktau Port is a key logistics hub connecting China, Central Asia, the Caspian region, the Caucasus, and Europe.

  • Dredged material is planned to be reused for land reclamation, expanding the port territory by approximately 170 hectares.

  • Maintenance dredging had previously been conducted periodically, mainly near berths and access channels, but on a smaller scale.

  • The current project is larger than previous campaigns and includes multi-phase deepening and infrastructure expansion.

  • The project is planned in three phases:

Phase I: deepening to approximately 7.7 meters;
Phase II: additional dredging if Caspian levels continue falling;
Phase III: long-term adaptation and further port modifications.

  • According to public statements, the project forms part of Kazakhstan’s long-term strategy to maintain maritime operations and increase cargo capacity along the Middle Corridor.

Sources

Publication Date

5/15/2026

bottom of page