top of page

Message

hero-bg.png

Astana Water Supply System Expansion

Potato Processing Complex.jpg

Value

PROJECT ID

2005202601

SECTOR

Water & Environment & Waste, Infrastructure & Construction

PROJECT PHASE

Procurement & Construction

LOCATION

Astana, Kazakhstan

START DATE

3/31/2025

END DATE

12/31/2028

INVESTMENT VALUE

$ 1400 M

Active

Verified

Updated: 2 Days ago

Publication: May 8, 2026

Project Description

The project is a large-scale EPC infrastructure development aimed at strengthening the drinking water supply system of Kazakhstan’s capital, Astana. It involves the construction of a 205 km raw water transmission pipeline from the Kanysh Satpaev Canal system to the city of Astana... Read more

Involved Companies & Contacts

Involved Companies & Contacts

Company:

1. party1CompanyNameText

Role:

2. party1RoleRepeater

Address:

3. party1CompanyAddressText

Phone:

4. party1CompanyPhoneText

Email:

5. party1CompanyEmailText

Other links:

7. party1CompanyWebsiteText

Website:

6. party1CompanyWebsiteText

Key Contacts 1

Name:

party1Contact1NameText

Position:

party1Contact1PositionText

Phone:

party1Contact1PhoneText

Email:

party1Contact1EmailText

Links:

party1Contact1LinkText

Key Contacts 2

Name:

party1Contact2NameText

Position:

party1Contact2PositionText

Phone:

party1Contact2PhoneText

Email:

party1Contact2EmailText

Links:

party1Contact2LinkText

PARTY 1 - Involved Companies & Contacts

companyTable

Field
Value
Company

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

Role

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

Address

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

Phone

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

Email

░░░░░░░░░░░░░░░░░

Website

NA

Other Links

NA

contact1Table

Field
Value
Name

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

Position

░░░░░░░░░░░░░░░

Phone

NA

Email

NA

Links

NA

contact2Table

Field
Value
Name

NA

Position

NA

Phone

NA

Email

NA

Links

NA

PARTY 2 - Involved Companies & Contacts

companyTable

Field
Value
Company

░░░░░░░░░░░░░░░░░░░░░░░░░░

Role

░░░░░░░░░░░░░░░░░░░

Address

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

Phone

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

Email

░░░░░░░░░░░░░░░░░░░░░░░░░░░░

Website

░░░░░░░░░░░░░░░░░░░░░░░░░░

Other Links

NA

contact1Table

Field
Value
Name

NA

Position

NA

Phone

NA

Email

NA

Links

NA

contact2Table

Field
Value
Name

NA

Position

NA

Phone

NA

Email

NA

Links

NA

PARTY 3 - Involved Companies & Contacts

companyTable

Field
Value
Company

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

Role

░░░░░░░░░░░░░░░░░░░

Address

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

Phone

░░░░░░░░░░░░░░░░░░░░░░░░░░░

Email

NA

Website

░░░░░░░░░░░░░░░░░░░░░

Other Links

NA

contact1Table

Field
Value
Name

NA

Position

NA

Phone

NA

Email

NA

Links

NA

contact2Table

Field
Value
Name

NA

Position

NA

Phone

NA

Email

NA

Links

NA

Company:

Value

Role:

Value

Address:

Value

Phone:

Value

Email:

Value

Website:

Value

Other links:

Value

Key Contacts

Name:

Value

Position:

Value

Phone:

Value

Value

Links:

Value

Phone:

Value

Value

Email:

Position:

Value

Name:

Value

Links:

Value

Email:

Company:

VALUE

Phone:

Value

Email:

Value

Address:

Value

Role:

Value

Website:

Value

Other links:

Value

Phone:

Value

Value

Email:

Name:

Value

Position:

Value

Links:

Value

Key Contacts

Phone:

Value

Email:

Value

Links:

Value

Name:

Value

Position:

Value

Company:

VALUE

Email:

Value

Phone:

Value

Address:

Value

Other links:

Value

Role:

Value

Website:

Value

Phone:

Value

Email:

Value

Name:

Value

Position:

Value

Links:

Value

Key Contacts

Phone:

Value

Email:

Value

Name:

Value

Position:

Value

Links:

Value

Company:

VALUE

Phone:

Value

Email:

Value

Address:

Value

Website:

Value

Role:

Value

Other links:

Value

Value

Phone:

Email:

Value

Name:

Value

Position:

Value

Links:

Value

Key Contacts

Phone:

Value

Email:

Value

Name:

Value

Position:

Value

Links:

Value

Other important details

  • Water source: Kanysh Satpaev Canal system (surface water abstraction)

  • Annual abstraction: ~102.2 million m³/year

  • Daily capacity: ~280,000 m³/day (system intake)

  • Treatment capacity (NFS-4): 210,000 m³/day

  • Pipeline length: ~205 km

  • Route optimized along existing transport corridors to reduce land impact

  • No viable alternative route identified in environmental filing

  • Public environmental hearings held in 2022 (small-scale local consultation)

  • No transboundary environmental impacts identified (explicitly stated)

  • Project life cycle: ~55 years of operation

  • PB Environmental Solutions LLP acted as the environmental consultant and preparer of the Environmental Impact Assessment (EIA) / “Report on Possible Impacts” documentation:

010000, Astana, Yesil District, Kabanbay Batyr Avenue, Building 6/1.
+7 707 661 36 09

+7 771 998 57 53 Almaty

+7 717 269 61 99 Astana

pbecoresheniya@mail.ru

astana@pbeco.kz

info@pbeco.kz

website: pbeco.kz

bottom of page