top of page

Message

hero-bg.png

300 MW Solar Power Plant Turkistan Region (Updated)

Potato Processing Complex.jpg

Value

PROJECT ID

172025176

SECTOR

Energy & Power Generation, Renewable Energy

PROJECT PHASE

Procurement & Construction

LOCATION

Sauran, Kazakhstan

START DATE

12/15/2025

END DATE

9/1/2026

INVESTMENT VALUE

$ 320 M

Active

Verified

Updated: 2 Days ago

Publication: May 8, 2026

Project Description

The project involves the construction of a utility-scale solar photovoltaic power plant in the Sauran District of Turkistan Region, Kazakhstan. The officially stated installed capacity is 300 MW AC, with an energy storage system included in the project scope. According to Samruk-... Read more

Involved Companies & Contacts

Involved Companies & Contacts

Company:

1. party1CompanyNameText

Role:

2. party1RoleRepeater

Address:

3. party1CompanyAddressText

Phone:

4. party1CompanyPhoneText

Email:

5. party1CompanyEmailText

Other links:

7. party1CompanyWebsiteText

Website:

6. party1CompanyWebsiteText

Key Contacts 1

Name:

party1Contact1NameText

Position:

party1Contact1PositionText

Phone:

party1Contact1PhoneText

Email:

party1Contact1EmailText

Links:

party1Contact1LinkText

Key Contacts 2

Name:

party1Contact2NameText

Position:

party1Contact2PositionText

Phone:

party1Contact2PhoneText

Email:

party1Contact2EmailText

Links:

party1Contact2LinkText

PARTY 1 - Involved Companies & Contacts

companyTable

Field
Value
Company

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

Role

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

Address

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

Phone

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

Email

░░░░░░░░░░░░░░░░░░

Website

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

Other Links

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

contact1Table

Field
Value
Name

░░░░░░░░░░░░░░░

Position

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

Phone

░░░░░░░░░░░░░░░░

Email

░░░░░░░░░░░░░░░░░░░░░░░░░

Links

NA

contact2Table

Field
Value
Name

░░░░░░░░░░░░░░

Position

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

Phone

░░░░░░░░░░░░░░░░

Email

░░░░░░░░░░░░░░░░░░░░░░░░░░░

Links

NA

PARTY 2 - Involved Companies & Contacts

companyTable

Field
Value
Company

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

Role

░░░░░░░░░░░░░░░░░░░░░░░

Address

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

Phone

░░░░░░░░░░░░

Email

NA

Website

░░░░░░░░░░░░░░░░░░░░

Other Links

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

contact1Table

Field
Value
Name

NA

Position

NA

Phone

NA

Email

NA

Links

NA

contact2Table

Field
Value
Name

NA

Position

NA

Phone

NA

Email

NA

Links

NA

PARTY 3 - Involved Companies & Contacts

companyTable

Field
Value
Company

░░░░░░░░░░░░░░░░░

Role

░░░░░░░░░░░░░░░░░░░░░░░

Address

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

Phone

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

Email

░░░░░░░░░░░░░░░░░░░

Website

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

Other Links

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

contact1Table

Field
Value
Name

NA

Position

NA

Phone

NA

Email

NA

Links

NA

contact2Table

Field
Value
Name

NA

Position

NA

Phone

NA

Email

NA

Links

NA

PARTY 4 - Involved Companies & Contacts

companyTable

Field
Value
Company

░░░░░░░░░░░░░░░░░░░░

Role

░░░░░░░░░░░░░░

Address

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

Phone

░░░░░░░░░░░░░░

Email

░░░░░░░░░░░░░░░

Website

NA

Other Links

NA

contact1Table

Field
Value
Name

░░░░░░░░░

Position

░░░░░░

Phone

NA

Email

NA

Links

NA

contact2Table

Field
Value
Name

NA

Position

NA

Phone

NA

Email

NA

Links

NA

Company:

Value

Role:

Value

Address:

Value

Phone:

Value

Email:

Value

Website:

Value

Other links:

Value

Key Contacts

Name:

Value

Position:

Value

Phone:

Value

Value

Links:

Value

Phone:

Value

Value

Email:

Position:

Value

Name:

Value

Links:

Value

Email:

Company:

VALUE

Phone:

Value

Email:

Value

Address:

Value

Role:

Value

Website:

Value

Other links:

Value

Phone:

Value

Value

Email:

Name:

Value

Position:

Value

Links:

Value

Key Contacts

Phone:

Value

Email:

Value

Links:

Value

Name:

Value

Position:

Value

Company:

VALUE

Email:

Value

Phone:

Value

Address:

Value

Other links:

Value

Role:

Value

Website:

Value

Phone:

Value

Email:

Value

Name:

Value

Position:

Value

Links:

Value

Key Contacts

Phone:

Value

Email:

Value

Name:

Value

Position:

Value

Links:

Value

Company:

VALUE

Phone:

Value

Email:

Value

Address:

Value

Website:

Value

Role:

Value

Other links:

Value

Value

Phone:

Email:

Value

Name:

Value

Position:

Value

Links:

Value

Key Contacts

Phone:

Value

Email:

Value

Name:

Value

Position:

Value

Links:

Value

Other important details

  • On July 21, 2025, Qazaq Green Power PLC, together with Dutch Green Power Investment B.V., established the legal entity Sauran Solar Power LLP, in which the public company Qazaq Green Power PLC holds a 30% equity stake. The remaining 70% ownership interest belongs to Dutch Green Power Investment B.V.

  • Dutch Green Power Investment B.V. is listed in Dutch registry-derived sources under the ownership/management chain involving China Energy Overseas Investment (Hong Kong) Co., Limited and Dutch Future Investments B.V.

  • The project’s material requirements are significant and include 581,360 PV modules, 5,790 support structures, 72 km of 35 kV collector lines, 2 main transformers, and a large-scale BESS package.

  • The environmental document lists 1,192 tonnes of reinforcing steel and concrete volume stated as 3.5871 × 10,000 m³, which equals approximately 35,871 m³ if the document’s unit format is interpreted literally.

  • The document also lists earthworks / excavation as 142.2908 × 10,000 m³, equal to approximately 1,422,908 m³ under the same literal unit interpretation.

  • The project will require temporary construction facilities, including around 1,200 m² of temporary residential/office premises and around 2,000 m² of temporary processing/storage facilities.

  • Water supply for the construction stage is planned as delivered water: 4,320 m³/year for drinking/domestic needs and 240 m³/year for technical water used for dust suppression.

  • The environmental screening conclusion states that mandatory full environmental impact assessment is not required, and the project initiator must submit an environmental impact declaration to the relevant local executive body.

  • Public discussions were held from 23 September 2025 to 29 September 2025.

  • Samruk-Energy’s project page lists the signing of a power purchase agreement with the Renewable Energy Financial Settlement Center on 16 June 2025 and the signing of an investment agreement and power purchase agreement with Sauran Solar Power LLP on 2 September 2025.

bottom of page