top of page
hero-bg.png

Aktau 500MW CCGP Plant

изображение.png
Photo Sources: www.gov.kz

PROJECT ID

304202602

SECTOR

Energy & Power Generation, Oil & Gas

PROJECT PHASE

Initiation & Feasibility

LOCATION

Aktau, Kazakhstan

INVESTMENT VALUE

$ NA

Active

gifyyyyy.gif

Verified

Last Updated: 25 April 2026

Publication: 3 April 2026

ОПИСАНИЕ ПРОЕКТА

The Aktau Combined Cycle Gas Power Plant Expansion is a planned large-scale energy infrastructure project aimed at constructing two combined-cycle gas turbine (CCGT) units with a total capacity of 500 MW in Aktau, Mangystau Region, Kazakhstan. The project is being developed with the participation of the Chinese state-owned energy group China Huadian Corporation through its subsidiary Huadian Overseas Investment Co., Ltd. The plant will use natural gas and modern combined-cycle technology, which integrates gas and steam turbines to significantly increase efficiency and reduce emissions compared to conventional thermal power plants. The new gen... Read more

Компании-участники

УЧАСТВУЮЩИЕ КОМПАНИИ И КОНТАКТЫ

COMPANY 1 INFO

КОМПАНИЯ:

░░░░░░░░░░░░░░░░░░░░░░░

РОЛЬ:

░░░░░░░░░░░░░░░░░░░░░░░

АДРЕС:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

ТЕЛЕФОН:

░░░░░░░░░░

Эл. почта:

░░░░░░░░░░░░░░░░░░

ВЕБСАЙТ:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

ДРУГИЕ ССЫЛКИ:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

КЛЮЧЕВЫЕ КОНТАКТЫ

ИМЯ:

░░░░░░░░

ДОЛЖНОСТЬ:

░░░░░░░░░░░░

ТЕЛЕФОН:

Ценить

ЭЛ. ПОЧТА:

Ценить

ССЫЛКА:

Ценить

ИМЯ:

░░░░░░░░░

ДОЛЖНОСТЬ:

░░░░░░░░░░░░░░░░░░░░░

ТЕЛЕФОН:

░░░░░░░░░░

ЭЛ. ПОЧТА:

Ценить

ССЫЛКА:

Ценить

РАСПОЛОЖЕНИЕ

Места, указанные на карте, носят ориентировочный характер и могут отличаться от фактического местоположения.

Другие важные детали

The project is linked to an earlier 160-MW combined-cycle gas plant currently under development in Aktau, which is expected to begin operations in 2027. That project is implemented by the same investor consortium and is intended to address electricity shortages and improve grid reliability in western Kazakhstan. The earlier plant has an estimated investment value of around USD 190–210 million