Dredging Operations in the Port of Aktau

PROJECT ID
1505202601
SECTOR
Logistics & Transport, Infrastructure & Construction
PROJECT PHASE
Engineering Design & Planning
LOCATION
Aktau, Kazakhstan
INVESTMENT VALUE
$ 43 M
Active
Verified
Last Updated: 15 May 2026
Publication: 15 May 2026
ОПИСАНИЕ ПРОЕКТА
The project involves dredging operations in the water area and approach channels of the Port of Aktau in Kazakhstan. It is designed to deepen the seabed to maintain and improve navigability for cargo ships, including tankers and container vessels operating on the Caspian Sea. The need for dredging is driven by natural sediment accumulation and fluctuating water levels in the Caspian Sea, which periodically reduce available draft for vessels. The project is part of Kazakhstan’s broader strategy to strengthen the Trans-Caspian International Transport Route (Middle Corridor). The works are intended to ensure safe maritime access and increase the... Read more
Компании-участники
УЧАСТВУЮЩИЕ КОМПАНИИ И КОНТАКТЫ
COMPANY 1 INFO
КОМПАНИЯ:
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░
РОЛЬ:
░░░░░░░░░░░░░░
АДРЕС:
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░
ТЕЛЕФОН:
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░
Эл. почта:
░░░░░░░░░░░░░░░░░░░░
ВЕБСАЙТ:
░░░░░░░░░░░░░░░░░░░░░░
ДРУГИЕ ССЫЛКИ:
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░
КЛЮЧЕВЫЕ КОНТАКТЫ
ИМЯ:
░░░░░░░░░░░░░░░░░░░░░░░░
ДОЛЖНОСТЬ:
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░
ТЕЛЕФОН:
░░░░░░░░░░░░░░░░
ЭЛ. ПОЧТА:
░░░░░░░░░░░░░░░░░░░░░
ССЫЛКА:
Ценить
ИМЯ:
░░░░░░░░░░░░░░░░░░░░░░░░░
ДОЛЖНОСТЬ:
░░░░░░░░░░░░░░░░░░░░░░░░░░░
ТЕЛЕФОН:
░░░░░░░░░░░░░░░░
ЭЛ. ПОЧТА:
░░░░░░░░░░░░░░░░░░░░░
ССЫЛКА:
Ценить
COMPANY 2 INFO
КОМПАНИЯ:
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░
РОЛЬ:
░░░░░░░░░░░░░░░░░░░
АДРЕС:
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░
ТЕЛЕФОН:
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░
Эл. почта:
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░
ВЕБСАЙТ:
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░
ДРУГИЕ ССЫЛКИ:
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░
КЛЮЧЕВЫЕ КОНТАКТЫ
ИМЯ:
*****
ДОЛЖНОСТЬ:
░░░░░░░░░░░░░░░░░░░░░░░░░░░
ТЕЛЕФОН:
Ценить
ЭЛ. ПОЧТА:
Ценить
ССЫЛКА:
Ценить
ИМЯ:
░░░░░░░░░░░░░
ДОЛЖНОСТЬ:
░░░░░░░░░░░░░░░░░░░░░░░░
ТЕЛЕФОН:
party1Contact2PhoneText
ЭЛ. ПОЧТА:
Ценить
ССЫЛКА:
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░
РАСПОЛОЖЕНИЕ
Места, указанные на карте, носят ориентировочный характер и могут отличаться от фактического местоположения.
Другие важные детали
The Aktau Port dredging project was initiated mainly due to declining Caspian Sea water levels and sediment accumulation reducing navigation depth.
Reduced depth limited the draft capacity of tankers, cargo vessels, and container ships entering the port.
The project aims to restore safe navigation and improve cargo-loading efficiency at Aktau Port.
The dredging program is strategically linked to the development of the Trans-Caspian International Transport Route (Middle Corridor).
Aktau Port is a key logistics hub connecting China, Central Asia, the Caspian region, the Caucasus, and Europe.
Dredged material is planned to be reused for land reclamation, expanding the port territory by approximately 170 hectares.
Maintenance dredging had previously been conducted periodically, mainly near berths and access channels, but on a smaller scale.
The current project is larger than previous campaigns and includes multi-phase deepening and infrastructure expansion.
The project is planned in three phases:
Phase I: deepening to approximately 7.7 meters;
Phase II: additional dredging if Caspian levels continue falling;
Phase III: long-term adaptation and further port modifications.
According to public statements, the project forms part of Kazakhstan’s long-term strategy to maintain maritime operations and increase cargo capacity along the Middle Corridor.
Источники
░░░░░░░░░░░░░░
░░░░░░░░░░░░░░
░░░░░░░░░░░░░░
░░░░░░░░░░░░░░