top of page
hero-bg.png

Construction of Foundry Plant in Karaganda Region

изображение.png
Photo Sources: www.gov.kz

PROJECT ID

2505202601

SECTOR

Industrial Manufacturing, Mining & Metallurgy

PROJECT PHASE

Procurement & Construction

LOCATION

100000 Doskey, Kazakhstan

START DATE

5/21/2026

END DATE

11/30/2027

INVESTMENT VALUE

$ 25 M

Active

gifyyyyy.gif

Verified

Last Updated: 28 May 2026

Publication: 25 May 2026

ОПИСАНИЕ ПРОЕКТА

Polymet Solutions Corporation LLP is developing a new foundry plant in Karaganda Region to supply cast steel products for Kazakhstan’s mining, metallurgical, and machine-building sectors. The project’s core commercial focus is the production of steel mill liners and grinding balls, which are used in ore-processing and industrial equipment. According to the official regional announcement, the plant is expected to produce up to 10,000 tonnes of products per year and create 257 new jobs after full implementation. The project is positioned as an industrial localization initiative that can reduce dependence on imported foundry products and support... Read more

Компании-участники

УЧАСТВУЮЩИЕ КОМПАНИИ И КОНТАКТЫ

COMPANY 1 INFO

КОМПАНИЯ:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

РОЛЬ:

░░░░░░░░░░░░░░░░░░░░░░░

АДРЕС:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

ТЕЛЕФОН:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

Эл. почта:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

ВЕБСАЙТ:

░░░░░░░░░░░░░░░░░░░░░░░░░░░

ДРУГИЕ ССЫЛКИ:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░

КЛЮЧЕВЫЕ КОНТАКТЫ

ИМЯ:

░░░░░░░░░░░░░░░

ДОЛЖНОСТЬ:

░░░░░░░░░░░░░░

ТЕЛЕФОН:

░░░░░░░░░░░░░░░░░░░░░░░░░░

ЭЛ. ПОЧТА:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

ССЫЛКА:

Ценить

ИМЯ:

░░░░░░░░░░░░░░░░

ДОЛЖНОСТЬ:

░░░░░░

ТЕЛЕФОН:

party1Contact2PhoneText

ЭЛ. ПОЧТА:

░░░░░░░░░░░░░░░░░░░░░

ССЫЛКА:

Ценить

COMPANY 2 INFO

КОМПАНИЯ:

░░░░░░░░░░░░░░░░

РОЛЬ:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

АДРЕС:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

ТЕЛЕФОН:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

Эл. почта:

░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░

ВЕБСАЙТ:

Ценить

ДРУГИЕ ССЫЛКИ:

Ценить

КЛЮЧЕВЫЕ КОНТАКТЫ

ИМЯ:

░░░░░░░░░░░░

ДОЛЖНОСТЬ:

░░░░░░░░░░░░░░░░░░░░

ТЕЛЕФОН:

Ценить

ЭЛ. ПОЧТА:

Ценить

ССЫЛКА:

Ценить

ИМЯ:

Ценить

ДОЛЖНОСТЬ:

Ценить

ТЕЛЕФОН:

party1Contact2PhoneText

ЭЛ. ПОЧТА:

Ценить

ССЫЛКА:

Ценить

РАСПОЛОЖЕНИЕ

Места, указанные на карте, носят ориентировочный характер и могут отличаться от фактического местоположения.

Другие важные детали

The project site covers 9.2 hectares and is located on land used under a secondary land-use agreement between the Management Company of SEZ “Saryarka” JSC and Polymet Solutions Corporation LLP. The environmental application identifies the cadastral number as 09-140-028-2007 and states that the nearest residential areas are approximately 2.41 km from Kokpekty and 4.15 km from Doskey village. The planned production structure includes 8,000 tonnes of large castings and 2,000 tonnes of small castings per year. The process concept provides for induction furnaces, including two IST-1.5 furnaces for the small-casting shop and two ABP-type furnaces for the large-casting shop. The declared raw materials include steel scrap, internal production waste, cast-iron scrap, fluxes and slag-forming materials, as well as oxidizing materials such as iron and manganese ore. The environmental application states that the selected moulding technology is a furan no-bake process, where sand is mixed with furan resin and an acid catalyst to form moulds and cores without additional heating. The project is not classified as mandatory EIA activity for primary iron and steel production, but it is subject to environmental screening due to its planned capacity and operating mode of 250 working days per year. The working project also provides for supporting infrastructure such as a checkpoint, vehicle inspection area, weighbridge, circulating-water pumping station, cooling tower, boiler house, LPG facility, water pumping station, fire-water reservoirs, potable-water reservoirs, wastewater tank, compressed-air reservoir, liquid-oxygen reservoir, and external utility networks.

Источники

░░░░░░░░░░░░░░

░░░░░░░░░░░░░░

░░░░░░░░░░░░░░

░░░░░░░░░░░░░░

Похожие проекты

bottom of page